View the
products resulting from the Action Agenda:
Safety | Mobility | Productivity
| Human & Natural Environment
.............................................
| Product | Team | Status |
| Traffic Management Systems | ||
| Traffic Management Center (TMC) National Pooled Fund Project: develop plan and initiate studies | Traffic Management Team & Human Center System Team | |
| Preliminary Human Factors Guidelines for TMCs | Human Center System Team | |
| ErgoTMC Multimedia Web Site and Advanced TMC Workshop to support Preliminary Human Factor Guidelines for TMCs | Traffic Management Team | |
| Ultraviolet Lighting and Fluorescence Materials Pilot Test Results at VA Tech's "Smart Road" | Roadway Team | |
| ITS Deployment Analysis System (IDAS) | Traffic Management Team | |
| Adaptive Control Systems (ACS) Field evaluation at 4 sites Initiate ACS "Lite" development |
Traffic Management Team | |
| Advanced Transportation Controller and Cabinet
Specifications |
Traffic Management Team | |
| Traffic Estimation and Prediction System
(TrEPS) Complete laboratory evaluation Initiate field evaluations |
Traffic Management Team | |
| Strategic Work zone Analysis Tools (SWAT) | Traffic Management Team | |
|
Traffic Software Integrated System (TSIS), Version 5.0 |
Traffic Management Team | |
| New Traffic Simulator Request for information Stakeholder forums Begin design and development |
Traffic Management Team | |
| Advanced Traffic Management System Research Analysis Database System (ARADS) | Enabling Technologies Team | |
| Traffic Management Team | ||
| Structures | ||
| Concrete members prestressed with fiber-reinforced polymer composite materials specifications (Also see Product Action Plan) | High-Performance Bridge Materials Team | |
| Timber bridge inspection manual | Bridge Design & Hazard Mitigation Team | |
| Culvert installation for AASHTO bridge specifications recommended provisions |
Bridge Design & Hazard Mitigation Team |
|
| Micropiles in seismic areas design guidelines manual | Geotechnical Team | |
|
Bridge-inspection condition rating based on the validation of visual inspection guidelines |
Infrastructure Inspection & Management Team | |
|
Bridge conditions and compositions in the (United States) comprehensive summary |
Infrastructure Inspection & Management Team | |
| Pavements | ||
| Superpave binder fatigue criteria in ALF experiment validation | Asphalt Pavement Team | |
| Modified asphalt binders evaluation protocols | Asphalt Pavement Team | |
| Crumb rubber and other modified binders evaluations | Asphalt Pavement Team | |
| HIPERPAV software and supporting documentation | Portland Cement Concrete Pavement Team | |
|
Materials-related distress in concrete pavements guidelines
|
Portland Cement Concrete Pavement Team | |
| Materials and procedures for curing concrete pavements guidelines | Portland Cement Concrete Pavement Team | |
| Petrographic revised, Web-based manual | Portland Cement Concrete Pavement Team | |
View
the products resulting from the Action Agenda:
Safety | Mobility | Productivity
| Human & Natural Environment
.............................................
US Department
of Transportation
Federal Highway Administration