Pre-Painting Conference
Project #___________________
Date:_____________
Inspector:__________________
The following issues should be addressed in this meeting. Minutes should be kept and a copy should be given to all meeting participants. Document any agreements reached.
- The nature of the work and its effects on the surroundings, including possible mitigation measures.
- Contractor’s method of operation, including equipment and personnel.
- Contractor’s schedule. Discuss weather-related concerns.
- Contractor’s job-specific worker health and safety plan (if lead paint is present).
- Proper storage of material and equipment.
- Location of recycling and dust collection and storage equipment.
- Inspector safety, including provision of safe access and safety from lead contamination.
- Inspection and measurement procedures, including control points.
- Identification and treatment of inaccessible areas.
- Product Data Sheets and Materials Safety Data Sheets for all relevant materials.
- Visual standards to be met. Discuss contractor’s preparation of field reference sections.
Back to the Manual
U.S. Department of Transportation
Federal Highway Administration
Research, Development, and Technology
Turner-Fairbank Highway Research Center
6300 Georgetown Pike
McLean, Virginia 22101-2296