The back-calculation procedure and steps reported in this document were used to determine the layered elastic properties (Young's modulus and the coefficient and exponent of the nonlinear constitutive equation) from deflection basin measurements for all LTPP test sections with a level E data status. The report summarized the reasons why MODCOMP4 was selected for the computations and analyses of the deflection data, provided a summary of the results using the linear elastic module (Young's modulus) for selected test sections, and identified those factors that can have a significant effect on the results. Some of the highlights and findings from this study and recommendations for future activities in support of accomplishing the overall LTPP objectives are included in this section of the report.
One of the reasons that MODCOMP4 was selected as the back-calculation program was that it has the capability to consider different nonlinear constitutive equations. It was initially hypothesized that the use of nonlinear constitutive response equations would significantly improve on the number of solutions with low RMS errors (less than 2 percent). However, significantly less than 50 percent of the test points were found to have solutions, with the RMS error less than even 4 percent using different nonlinear constitutive equations. Thus, the hypothesis was found to be untrue or incorrect using the existing software and deflection data measured at the LTPP sites.
Back-calculation of elastic properties, however, is not an exact procedure or science and requires manual interaction with the user, especially when using the nonlinear module of MODCOMP4. More importantly, more sensors are probably needed to define clearly the deflection basins for back-calculating the nonlinear elastic properties for the pavement layers and subgrade soils, especially for pavement structure with more than two layers. Thus, the back-calculation of nonlinear elastic layer properties should not be completed on a mass-production basis.
Results from this study do provide elastic layer properties that are consistent with previous experience and laboratory material studies related to the effect of temperature, stress state, and season on material load-response behavior. The following lists some of the important observations or findings from this back-calculation study.
- No one constitutive equation always resulted in the lowest RMS error. Each of the constitutive models used resulted in linear solutions for the linear elastic load-response behavior condition (i.e., intercepts of the load-deflection relationship near zero with R2 values greater than 0.99; refer to figure 2).
- The bulk stress, deviator stress, and minor principal stress constitutive models (model numbers 1, 2, and 3, respectively; refer to table 5) were found to be the more reliable for obtaining an adequate or reasonable solution.
- On the average, over 75 percent of the deflection basins analyzed with the linear elastic module of MODCOMP4 resulted in solutions with an RMS error less than 3 percent and are considered acceptable.
- Those pavements exhibiting deflection-softening behavior with Type II deflection basins were the most difficult to analyze and were generally found to have RMS errors greater than 2 percent. Some of these basin analyses resulted in no reasonable solutions or the solutions provided unrealistic layer modulus for the type of material defined in the LTPP database.
- The use of four layers generally resulted in lower RMS errors than the use of three layers (i.e., breaking the subgrade into two layers). In many cases, breaking or separating the subgrade into at least two layers significantly improved on the match between the measured and calculated deflection basins.
- The consideration and use of an apparent depth to a rigid layer is important, and the results were found to be sensitive to this input parameter element. In other words, a rigid layer must be accounted for when present. However, low RMS error values were obtained for many test sections without specifying an apparent rigid layer at some depth. In fact, there were many cases in which the RMS error was larger when a rigid layer was arbitrarily included at 6 m or more.
The results from this study have shown that elastic layer properties, especially Young's modulus, can be computed from deflection basins and provide the pavement engineer with useful information on the pavement's structure and subgrade condition. It is recommended that a detailed analysis of these results be completed to demonstrate their usefulness and to identify problem or unique test sections. It is also recommended that deflection basins, measured in the future along the LTPP test sections (especially the SPS test sections), be used to compute the elastic properties of the pavement and subgrade layers in order to evaluate changes in the layer moduli with time or age. Completing the back-calculation process of the nonlinear elastic properties on a production basis, however, is not recommended.
Von Quintus and Killingsworth previously recommended a set of C-values for adjusting the back-calculated moduli from FWD deflections to laboratory-measured resilient moduli or vice versa.(1) These C-values were determined from back-calculated layer moduli using the MODULUS and WESDEPTH software packages. In all probability, these C-values are dependent on the back-calculation software package used. Thus, the back-calculated Young's modulus derived from MODCOMP should be compared with laboratory-measured resilient moduli for the different pavement materials and subgrade soils.
The use of MODCOMP, MODULUS, and other software packages to calculate elastic layer properties from FWD deflection basins does not provide reasonable solutions in every case because these programs are not perfect simulations of real-world conditions. Each program has limitations and inaccuracies in simulating the deflection basins. However, as quoted from Von Quintus, Bush, and Baladi in the 1994 International Conference on NDT and Back-Calculation of Moduli:(13)
In summary, most participants concurred that there needs to be a standard baseline of values from which to compare a project, material, or pavement base and that one should not become paralyzed by the imperfection of the procedures. More importantly, research must be merged into practice on a consistent basis and one way to accomplish this is through the standardization process. As such, a procedure needs to be standardized and that procedure should concentrate on user oriented issues.This study has attempted to implement and apply existing standardized procedures (ASTMD5858 and FHWA-RD-97-076) to back-calculate Young's modulus and the nonlinear elastic properties for each pavement and subgrade layer. Results from this extensive effort, as well as from other studies, such as FHWA-RD-97-086, are promising and have shown that reasonable solutions for Young's modulus can be obtained. These computed parameters have been included in the LTPP database for future pavement performance and material studies. These results also provide a baseline of solutions and elastic properties for which the results from future studies can be compared and improved upon.Another quote from Von Quintus, Bush, and Baladi at the 1994 International Conference reads as follows:(13)
The question, however, is still: what is the reliability of these values? Specifically, it was the general consensus of the panel and attendees that the accuracy of back-calculated moduli is model dependent and unknown, as well as those values measured in the laboratory because there is a diversity of opinion on the simulation of field conditions in the laboratory. For example, there is controversy within the industry on whether back-calculation procedures should be based on a dynamic or static analysis, and what values actually represent the truth, both in the laboratory or from field measurements.Unfortunately, the relationship between the computed parameters from this study and resilient moduli from the laboratory repeated-load testing has not yet been established.
- Von Quintus, H.L. and B. Killingsworth, Design Pamphlet for the Backcalculation of Pavement Layer Moduli in Support of the 1993 AASHTO Guide for the Design of Pavement Structures, Publication No. FHWA-RD-97-076, Washington, DC: Federal Highway Administration, September 1997.
- Harichandran, R. S. et al, MICHBACK User's Manual, Version 1.0 for DOS, Michigan State University, Lansing, MI, 1995.
- Von Quintus, H. L. and B. Killingsworth, Back-Calculation of Layer Moduli of LTPP General Pavement Study (GPS) Sites, Publication No. FHWA-RD-97-086, Washington, DC: Federal Highway Administration, July 1997.
- Von Quintus, H. L. and B. Killingsworth, Analysis Relating to Pavement Material Characterizations and their Effects on Pavement Performance, Publication No. FHWA-RD-97-086, Washington, DC: Federal Highway Administration, May 1997.
- May, R. W. and H. L. Von Quintus, The Quest for a Standard Guide to NDT Back-Calculation, STP 1198, American Society for Testing and Materials, Philadelphia, PA, December 1994.
- PCS/Law Engineering, SHRP's Layer Moduli Back-Calculation Procedure, SHRP-P655, Washington, DC: Strategic Highway Research Program, National Academy of Science, 1993.
- Strategic Highway Research Program, SHRP Layer Moduli Back-Calculation Procedure-Software Selection, SHRP Technical Report, Washington, DC: July 1991.
- Daleiden, J. F., et al., Evaluation of the AASHTO Design Equations and Recommended Improvements, Report No. SHRP-P394, Washington, DC: Strategic Highway Research Program, National Academy of Science, 1994.
- Simpson, A. L., et al., Sensitivity Analyses for Selected Pavement Distresses, Report No. SHRP-P393, Washington, DC: Strategic Highway Research Program, National Academy of Science, 1994.
- Irwin, L. H., Instructional Guide for Back-Calculation and the Use of MODCOMP, CLRP Publication No. 94-10, Cornell University, Local Roads Program, Ithaca, NY, March 1994.
- Telephone conversation with Dr. Vincent Janoo, CREL, November 1997.
- Nondestructive Testing of Pavements and Back-Calculation of Moduli, STP 1026, American Society for Testing and Materials (Editors: Albert J. Bush, III and Gilbert Y. Baladi), Philadelphia, PA, November 1989.
- Nondestructive Testing of Pavements and Back-Calculation of Moduli, Second Volume, STP 1198, American Society for Testing and Materials (Editors: Harold L. Von Quintus, Albert J. Bush, III and Gilbert Y. Baladi), Philadelphia, PA, December 1994.
- Meeting of consultant and agency personnel to discuss the benefits, advantages, and disadvantages of different back-calculation programs, sponsored by FHWA under the DATS contract, Baltimore, MD: February 1997.
- Rada, G., C. Richter and P. Jordahl, SHRP's Layer Moduli Backcalculation Procedure, Second Volume, STP 1198, American Society for Testing and Materials (Editors: Harold L. Von Quintus, Albert J. Bush, and Gilbert Y. Baladi), Philadelphia, PA, December 1994.
- Michalak, C.H. and T. Scullion, MODULUS 4.2: User's Manual, Research Report 1939-1, Texas Transportation Institute, College Station, TX, 1993.
- AASHTO Guide for the Design of Pavement Structures, American Association of State Highway and Transportation Officials, Washington, DC: 1993.
- LTPP Strategic Analysis Plan, Publication No. FHWA-Rd-01-086, Washington, DC: Federal Highway Administration, March 2001.
Introduction
Back-calculation is a process for estimating the elastic layer modulus in pavement structures that represent in situ conditions under a test load. Back-calculation gets its name from the fact that a load of known size and shape is applied to the pavement and deflections are measured by sensors at known distances from the load. Theoretical predictions are made of the deflections, assuming certain layer properties, and those properties (usually elastic layer modulus) are adjusted until the calculated deflections match the measured deflections within a reasonable RMS error (goodness-of-fit between the measured and calculated deflection basins).
Back-calculation of elastic properties is usually performed with static-linear analyses, and there are numerous computer programs or software packages that can be used to calculate the elastic properties of each layer. The MODCOMP4 software package was selected and used for analyzing the LTPP deflection data, because (among other features) it is capable of doing back-calculation for massive quantities of deflection data using both linear (Young's modulus) and nonlinear (stress dependent elastic modulus) approaches for materials characterization.
Nonlinear materials are those for which the modulus depends on the applied stress (i.e., stress-dependent) and is not a single number but a relationship between modulus and stress. Numerous mathematical forms have been used to represent the relationship between modulus and stress. The particular relationship adopted for a layer material is referred to later in this document as a constitutive equation.
Purpose of User's Guide
The back-calculation procedure explained in this appendix is a tool that agencies can use in the future to update the computed parameters (elastic properties) of each layer for the LTPP test sections as more and more deflection basin data are measured over time. This User's Guide is intended to accomplish the following objectives:
- To describe the features of the software and combination of the individual models so that potential users can determine its applicability to their needs.
- To list and define those steps and decision functions that are used in the process, especially those requiring engineering judgment of the user.
- To provide users with all of the information necessary for them to operate and use the software packages or models efficiently.
The back-calculation process is a series of DOS-based programs, and the user must be familiar with the use of these types of programs to complete the process. The user should also be experienced and knowledgeable in the back-calculation process and familiar with the LTPP database. The audience intended for this User's Guide includes pavement materials and design engineers; research engineers; pavement management engineers; and other professionals in Federal, State, and local government; academia; and in private industry.
Back-Calculation Procedure Overview
The overall operational process for back-calculating the layer modulus basically follows the procedure outlined by Von Quintus and Killingsworth in publication number FHWA-RD-97-076(1) and the Instructional Guide for Back-Calculation and the Use of MODCOMP.(10) This process was developed for back-calculating massive quantities of deflection data that are stored within the LTPP database (the IMS or a centralized location).
The procedure used to back-calculate the elastic properties of each layer for the LTPP test sections consists of a number of operations. This User's Guide identifies and discusses all of the operations (programs and decision functions) included in this process. The procedure is not fully automated but is an iterative process between the different programs and requires engineering judgment of the user. The following lists those major steps that are used in the process:
Step 1 -- Extract Data from IMS
Step 2 -- Preprocess the Extracted FWD Deflection Basin Data and Section Classification
Step 3 -- Create Input Files for MODCOMP4
Step 4 -- Trial Computations and Modification of Inputs
Step 5 -- Back-Calculate Young's Modulus and the Nonlinear Elastic Properties Using MODCOMP4
Step 6 -- Extract Elastic Properties and Create Summary Output Files
An important fact regarding future use of the procedure is that the LTPP database is dynamic, and the programs that are used to extract the data were written based on the database that existed in 1998. These programs may need to be revised as the LTPP database is updated and changed over time. The following identifies and describes briefly the programs used to accomplish the above operations. Figure 31 is a flow chart of the back-calculation procedure.
- Programs INV_MOD, TST_MOD, and TST_MOD2 obtain materials data from State highway agency (SHA) inventory files and LTPP materials testing programs that have been collected and stored in the LTPP database. CONTROL gets a list of sections and dates for which deflection data exist, and TEMP_MOD retrieves pavement temperature data taken during the deflection acquisition. Structured Query Language (SQL), a database query tool, statements generated by a SQL script GEN_FWD.SQL are used to obtain the deflections themselves.
- Program DEFLAVG4 performs averaging and editing on the acquired deflection data.
- Program MODDATA takes the data acquired in steps 1 and 2, provides estimates of the modulus for each layer, and performs layer combination in accordance with a set of rules in the cases where there are too many layers to analyze separately.
- Program METRIC converts the values in the MODDATA output to metric units; MODDATA was originally written for an earlier back-calculation effort in which English units were used.
- Program PREMOD3 converts the metricated output of MODDATA (containing data sets for multiple locations [stations] within one section on one or more dates) into individual data files for the averaged deflections at each section, date, location, and drop height to be used by program MODCOMP4.
- Program BATCHIT creates two batch files based on the output files generated by a single run of PREMOD3. The first sets up the directory structure to hold the (many) PREMOD3 output files for a specific test section. The second changes to each of the resulting directories in turn and executes MODCOMP4 for each data file within that subdirectory; the data and output files are then compressed together and stored.
- Program MODCOMP4, written by Dr. Lynne Irwin of the Cornell University Local Roads Program (CLRP), is the program used for the actual back-calculation of layer modulus from the deflection basins.(10)
- Program BACKSUM2 (for linear back-calculation) obtains desired information from many MODCOMP4 "summary" files and places it in a single file, performing many file manipulation operations to achieve this result.
- Program BAKSUMNL obtains the same data as BACKSUM2 but from the summary files for nonlinear runs, which have a slightly different format.
- Program BAKOUTNL obtains the specific coefficients and exponents for the selected equation form for each layer of the nonlinear solution from the much lengthier "full-output" files that are not available from the summary files.
At the conclusion of this process, the detailed results for each back-calculation are available in the stored MODCOMP4 summary and output files, and the specific results (layer modulus for each layer and load level for the linear solutions, and the modulus for the highest load level and the coefficients and exponents for the selected equation form for each layer for the nonlinear solutions) are stored in separate files. These files also include for each solution the section identification, location within the section, date and time of deflections, pavement layer temperatures, layer thickness and material type, and, for nonlinear solutions, the model that was used for each layer. The files are then manipulated to produce tables suitable for loading into the LTPP Oracle® database.
Step 1: IMS Data Extraction
The user must first designate or identify what test sections are to be back-calculated. The Technical Services Support Contractor (TSSC) will normally execute the data extraction programs or packages to retrieve the required data and other information. These programs and their use are defined below.
Programs INV_MOD, TST_MOD, TST_MOD2, and TEMP_MOD acquire data for all sections from the relevant tables in the LTPP database. The resulting files can be considered "archival" in the sense that they are obtained once and used without modification during a particular series of back-calculation.
Note 1: As more testing data and more deflection basins are acquired and added to the IMS, they should be regenerated at the beginning of each back-calculation exercise.Note 2: The LTPP database is dynamic, and the programs that are used to extract the data from the IMS were written based on the database that existed in 1998. These extraction programs may need to be revised as the LTPP database is updated and changed over time.
Note 3: The inventory data are used only as a backup when other data are missing or unavailable in the database, with the exception of asphalt viscosity data. Viscosity data are included only in the inventory data tables in the LTPP database.
All of these extraction programs are executed with the following syntax:
programname <output file name> <connect string>where <connect string> is the character string <username/password@database>. Obviously, these programs must be executed by an agency that has a connection to the LTPP database -- normally, the TSSC.
Program CONTROL is similar but not identical in usage. The syntax for it is:
control <output file name> <connect string> <low state> <high state>where <low state> and <high state> are the LTPP State or Province codes for the first and last State to be included in the run. One may, therefore, generate control files for one State at a time, a group of States, or all the states at once (where "State" refers to both States and Provinces). One may generate output for all the States and later break the resulting file down into smaller groups of test sections in an editor (a useful procedure if one is dependent on TSSC for running the program).
For convenience, this input guide refers to the output files of the above programs as INV_MOD.lis, TST_MOD.lis, TST_MOD2.lis, TEMP_MOD.lis, and CONTROL.lis. In the first three, remembering that TST_MOD2.lis is the same as TST_MOD.lis except that it provides data where available for construction number 2 (rehabilitation events), the same set of information is provided for all layers; all layers will have blank fields where the field is inappropriate for the material type of that layer. These programs convert metric density to English units but otherwise leave the values in the units used in the LTPP database. The LTPP database was undergoing a metrication process, so the user must be careful about using the programs. Program MODDATA, which uses the output of these programs, was written to use English units throughout.
TEMP_MOD.lis provides both the hole depths and the temperature readings at those holes (which are drilled such that top, middle, and bottom temperatures are obtained) during the deflection testing for each section visit, as well as the date, time, and location of the hole. No conversions are done to the temperatures, so they are output in the units present in the LTPP database (metric after May 2000).
Sample data:
![]()
For section 011001 on October 11, 1989, at stations -5 and 510, we have holes in the pavement of 1.0, 2.0, and 3.0 inches deep, with the indicated temperatures (F) at times from 0900 to 1135.
The last type of data obtained from the IMS is the data for the deflection basins. An SQL script, GEN_FWD.SQL, (which may be edited to obtain data for GPS, for SPS, or for seasonal sites), is run that produces a second (very large) SQL script that obtains the deflections in English units of mils (.001 inch), peak loads (in ksi), and air and pavement temperatures (in degrees F) for each section and visit date, and writes the data for each section (all visits) to a separate file. Again, this requires a connection to the IMS and would most probably be done by the TSSC. The output files from this process are labeled F<state_code><shrp_id><construction_no>.lis.
Step 2: Preprocess the FWD Deflection Data -- Execute DEFLAVG4
As discussed above, the deflection data acquired are passed through program DEFLAVG4, which performs several operations on the data. Deflection data from the IMS consist (normally) of basins from 12 drops (rigid pavements) or 16 drops (flexible pavements), 4 at each drop height, or nominal load. The deflections for each drop at a given drop height are normalized by the load for that drop; the normalized drops are then averaged and the results multiplied by the average load for that drop height. This is done for each of the seven sensors.
The program is run by typing in the command prompt: DEFLAVG4<space><Data File Name><return>. The use of the DOS FOR-DO loop will make it possible to execute DEFLAVE4 on all FWD data files in a subdirectory with one command.
In performing these operations, the deflection basins are checked for nondecreasing deflections with increasing distance from the load; if this occurs, the drop is omitted from the average. In addition, a test for variation based on that used in the FWD software itself is applied: If an individual (renormalized) deflection value differs from the average by more than (0.08 + 1 percent [average deflection]) mils, that difference is calculated for all sensors and summed. The drop having the largest sum is excluded, and the average is recalculated. If necessary, this process is repeated, leaving only two drops. If they differ from their average by more than the above amount, the average is accepted but marked as "variant" in the output file. The criteria of 0.08 mils and 1 percent are from the stated accuracy specifications on the FWD unit itself.
If all the drops at a given location and load have nondecreasing deflections, they are all discarded. If all but one is discarded, the remaining value is used, but obviously there can be no check for variation in this case. The number of drops contributing to the final average is recorded in the output file for each drop height; where only two remain and one or more sensors show variation, the deflection values for those sensors are so indicated in the output file.
The program name DEFLAVG4.exe indicates the version used for flexible data with four-digit years in the dates. (DEFLAV_R.exe is the same except that it is used with rigid pavement deflection basin data, and uses only data from mid-slab basins [lane numbers J1 or C1].) Output files have the same file name as the input file, with an extension ".AVG." A "log" file is written for each run, showing the details of the averaging and drop exclusion process. This file has the ".LOG" extension.
Note 4: Program BASIN is executed external to the back-calculation process to determine the load-response (figures 2-4) and basin (figures 5-8) classification of the deflection basin data. Figure 32 illustrates the flow diagram for characterizing the deflection basin measurements. The load-response classification assists the user in selecting the initial constitutive equation for the nonlinear module of MODCOMP. The BASIN program is not needed for the linear module.
Figure 32. Flow chart for the deflection basin and load-response characterization procedure.
Example data file for one station, two load heights (F0110011.lis):
![]()
The section (State code and SHRP_ID), date, lane, load height, station, drop time, air temperature, and pavement temperature are present for each drop, followed by the load, the seven deflections, and the construction number.
Example output file for the above input data (F0110011.avg):
![]()
The single digit at the end of the output line is the number of drops that contributed to the average; the construction number is retained as the last digit in the file name.
Step 3: Create Input Files for MODCOMP4
Execute MODDATA
MODDATA reads information from the files discussed above and creates an output file consisting of identification, layer information, and deflections for each location at which deflection basins were obtained (and which passed through the DEFLAVG programs). Most importantly, it derives initial estimates for modulus and Poisson's ratio for each layer from the material types and physical properties of those layers. Initial estimates for the layer modulus are computed in accordance with a regression equation or obtained from a tabular listing of values for different materials, whereas estimates of Poisson's ratio are automatically obtained from a tabular listing of values for different materials (refer to table 4).(1,15)Automatic Layering Definition
For sections having more than five layers, MODDATA performs layer combinations according to rules established by LTPP in 1993, unless the user overrides the process with desired specific layer combinations.(15)
Note 5: Although the original back-calculation program used with MODDATA could handle only five layers total (including rigid base) and MODCOMP4 can handle many more, it is considered inappropriate to solve for more than five layers when using MODCOMP4.To run MODDATA, it is best to establish some standard file locations, or paths, ahead of time. The following are suggested:
<exepath> The location of the executable programs in this process.
<commpath> The location of common data files used for multiple runs of MODDATA on different deflection data (e.g., the IMS extraction data files).
<deflpath> The location of deflection data files generated by DEFLAVG4 or DEFLAV_R.
<sectpath> The location of files unique to a specific run of MODDATA.MODDATA can use (but does not require) several input files in addition to those containing the IMS extraction data; when executed, the program requests that each file name be entered in response to a labeled prompt, shown as follows, with the recommended location for each:
Enter name of REFERENCE file <sectpath>F0110011.CNT
Enter name of INVENTORY DATA file <commpath>INV_MOD.LIS
Enter name of MATERIALS TEST file <commpath>TST_MOD.LIS
Enter name of DEFLECTION TEMPS file <commpath>TEMP_GPS.LIS
Enter name of DEFLECTION DATA file <deflpath>F0110011.LIS
"NONE" CAN BE ENTERED FOR THE NEXT FOUR FILENAMES
Enter name of IN-SITU DENSITY DATA file <commpath>ISDMOIST.DAT
Enter name of EXTERNAL LAYER COMBINATION file <commpath>LAY_COMB.DAT
Enter name of EXT. LAYER MODULUS INPUT file <commpath>SEED.DAT
Enter name of STATION SPLIT-LOCATION file <commpath>SUBSECT.DAT
Enter name of ERROR OUTPUT file <sectpath>F0110011.ERR
Enter name of SUMMARY OUTPUT file <sectpath>F0110011.OUT
Enter name of DATA OUTPUT file <sectpath>F0110011.DAT
Each file shown in <commpath> will normally contain data for many test sections, and in the case of TEMP_GPS, numerous dates per test section. F0110011.CNT, the control file in the example shown, will have multiple dates for the test section 011001, construction number 1. The program will search each file for the test section identification 011001 and will search for the specific dates in TEMP_GPS and in F0110011.LIS. If a control file containing section identifications for multiple sections is used, the data for each section will be sought within each file.
Manual Override or Optional Inputs for MODDATA. The optional input data files ISDMOIST.DAT, LAY_COMB.DAT, SEED.DAT, and SUBSECT.DAT provide additional data and allow the user to override the program choices.
Note 6: Format details are provided later for these files.ISDMOIST.DAT provides in situ densities (from nuclear density gauge measurements) and moisture contents for base and subgrade layers where such measures are available. The values in the IMS were obtained at specified depths from the surface; those depths must be converted to layer numbers before they are useful in this application, and that is most easily done by hand-external to the program. Averages are taken of multiple data values for a single layer where such exist. These values are needed for nonlinear back-calculation where the weight of the material overlaying a given layer is taken into consideration in calculating the stresses within that layer.
![]()
LAY_COMB.DAT allows the user to control the process of layer combination externally, based on previous back-calculation attempts or on study of the standard layer combination performed by MODDATA. If any combination is specified in LAY_COMB, all desired combinations must be specified and the automatic process is turned off.
![]()
In this example, the first four sections of the Alberta SPS5 project are handled differently from the last four: In the first four layers, 4 and 5 are combined, and layer 6 is prevented from combining with another layer. In the last four, layer 4 is prevented from combining, and layers 6 and 7 are combined.
SEED.DAT allows the user to bypass the internal calculation or lookup of modulus estimates for specific layers and to specify the value to be used. The values entered apply to the original layering, not the final layering after combination. Therefore, to ensure that a layer after combination has a specific value, all components of that combined layer must be given that value. An example follows:
![]()
In each of the three sections shown, the asphalt top layers were combined in the final output.
SUBSECT.DAT allows the entry of a station value that serves to split the section into two subsections; thickness of each layer from the approach testing area will be applied to all deflection stations less than that value, and those from the leave testing area will be applied to the remainder of the stations. Special values for this station exist: +9999 will enable the use of average layer thickness for all stations (the default situation), and -9999 will cause thickness values from the "nearest end" to be used for analysis of deflections taken in the testing areas and the average values for deflections obtained within the section.
Note 7: The "average values" referred to here are the values from LTPP database table TST_L05B, which are values considered "representative" of the section; these are often but not always averages of the values from the two ends.An example follows:
![]()
For the first section, the layer thickness from the approach end will be applied to all stations; for the next three sections, those from the leave end will be used. For 041037, those before station 250 will use the approach-end thickness, and those equal to or after 250 will use layer thickness from the leave end.
Program Output.
The output files F0110011.{ERR,OUT,DAT} are to some degree redundant but have specific purposes. The .ERR file contains, in addition to error and informative messages, details of temperature interpolation and of asphalt stiffness calculations. It is not intended to be printed because of its size (it is too large).The .OUT file contains the original layering, the layering after combining asphalt layers, and the final layering after combining other adjacent layers of similar materials. In this way, the user can see exactly what is being done and make decisions as to whether the automatic process produces a result consistent with the user needs. The .DAT file is the output file used in following the steps in the back-calculation process; it contains the final layer system (with estimated modulus, thickness, Poisson's ratios, material densities and moisture contents, and for pavement layers the interpolated mid-layer temperature) and the average load and deflections at a specific date, time, station, and load height.
Because there are so many input and output files for MODDATA, it is recommended that a "file of file names," or metafile, be established prior to running the program. This can easily be done in a text editor and allows easy corrections of typing errors without starting over from the beginning, as would be required if an error occurred in a file name entry directly into MODDATA. In addition, such a metafile can be stored with the run-specific input (CONTROL) and output files in a compressed (ZIP) file for future reference and/or use. The standard DOS redirection of input from the console to the specified metafile is accomplished using the less-than symbol, as shown below:
MODDATA < metafilename
Execute METRIC
Program METRIC uses the .DAT file output by MODDATA as input and writes out a file, normally with the same file name and an extension of .MET, containing the same information in metric (SI) units for use in MODCOMP4, as follows:
Item MODDATA METRIC Conversion Factor Layer thickness in m (= inches*.0254) Layer modulus ksi MPa (= ksi*6.894757) Layer density pcf kg/m3 (= pcf*16.01846) Temperature hole depths in micron (= inches*25.4) Interpolated temperatures °F °C (= [deg F-32]*.555555) Depth to refusal ft m (= feet*.3048) FWD load lb force kN (= lbs*.004448222) FWD deflections mils mm (= mils*25.4)
Note 8: Deflection location values (in feet) were not changed because they are descriptive only.Sample input and output files:
![]()
For this example, MODDATA output (English and Metric) for section 091803 (in CT) has three layers after combinations.
- The subgrade has a starting modulus of 26.5 ksi, with no stated upper and lower limits.
- The base is 12.0 inches thick, with a starting modulus of 30 ksi, bounded by 10 and 132.4 ksi.
- Both base and subgrade have a Poisson's ratio of 0.35, a density of 125 pcf, and a moisture content of 8 percent. (The upper and lower bounds derived by MODDATA are not used with MODCOMP4.)
- The asphalt layer, in addition to the above parameters, shows a mid-depth temperature of 88.5° F.
- The depth to refusal as determined in July 1989 was 4 feet.
- Deflections from August 1994 at station 500 were taken with a load of 6,038 pounds, at air and pavement surface temperatures of 81 and 102° F, respectively, in mid-lane (F1), with gradient temperatures interpolated to the time of observation of 96.9, 88.1, and 80.6° F at depths of 1.4, 3.7, and 6.2 inches, respectively.
- The single digits 0 and 1 prior to the lane specification are the crack width (not measured except for load-transfer deflection data, which is not used for back-calculation) and load height indicators, respectively.
Execute PREMOD3
Program PREMOD3 takes data from MODDATA (after passing through METRIC), consisting of multiple average deflection basins for different loads at multiple points on multiple dates, and writes out input data files acceptable to MODCOMP4. For linear back-calculation, one data file is required for each average basin studied; for nonlinear studies, the basins for all loads done at one location and time are included in one data file. A very large number (up to 5,000) of data files can be generated by one run of PREMOD3 (e.g., linear studies for a seasonal site).The program allows external user control (again, by auxiliary data files) of the choice of sensors associated in MODCOMP4 with a specific layer (usually done after the first run through MODCOMP4 with automatic assignment), the choice of nonlinear models for specific layers, and the choice and depth of a second subgrade layer and/or a rigid foundation.
Note 9: A second subgrade is often used to model the changes of confining and deviator stresses with depth. A rigid foundation can model the actual presence of a very stiff layer at depth or the effect on the subgrade of a nearly vanishing deviator stress and increasing confining pressure at depth, which may make the subgrade material act as though it were a very stiff layer. In addition, for a thin layer or a layer for which the stiffness is considered known, the modulus can be entered as a "known" value, not subject to change by the program.A metafile can be established for PREMOD3 runs in a manner similar to that for MODDATA, enabling better batch (unattended) operation, if needed, and providing the opportunity for correcting typing errors without restarting the program. This metafile can use the extension .PMD and a file name showing the SHRP_ID, if desired. It will contain responses to questions asked by PREMOD3, as well as the file names (or "NONE") of the files described above. When executed, PREMOD3 asks the user for the following information:
English (E) or Metric (M)
ENTER NAME OF MODDATA OUTPUT FILE: <shrp_id>.MET
ENTER NAME OF STIFF-BASE-DEPTH FILE, or type NONE: STIFBASE.DAT
ENTER NAME OF NON_LINEAR MODELS FILE, or type NONE: MODELS.DAT
ENTER NAME OF SENSOR/FIXED-STIFF FILE, or type NONE: SENSOR.DAT
ENTER LOG FILE NAME FOR THIS RUN: <shrp_id>.LOGENTER OUTSTYLE, TOL, CONVRATE, MAX ITER, MODEL NUMBER
(use single quotes on CHAR. inputs)Because for this project MODCOMP4 was to be run in metric units, the first question is always answered with an M, and the .MET data file output by METRIC is used for the second. Standard names were established for the next three files, as shown above; the log file name is arbitrary, but the above choice is consistent and recommended.
OUTSTYLE is a character variable in MODCOMP4 describing the volume of output requested: BRIE (brief), LONG, or ALL. BRIEF echoes the input and gives final layer modulus. LONG reports the layer modulus for each iteration, and ALL reports intermediate calculations as well; ALL gives very lengthy output and should be used with care.TOL is a single character variable in MODCOMP4 describing the allowable tolerance on the fit to the deflections: values of L (low), M (medium) and H (high) are allowed, H (high) is recommended. This applies only to those sensors assigned to specific layers. H (high) tolerance implies a good fit, not large residuals.
CONVRATE is a numeric value indicating a lower limit on the rate of change of modulus between iterations; 1.5 percent is usually used.
MAX ITER is the maximum number of iterations allowed before the program "gives up"-- usually 15. If this number is reached, either new starting values or new sensor assignments are probably needed.
MODEL NUMBER has the following allowable values and meanings:
0 - Use linear for all layers
>0 - Nonlinear model to be used for -ALL- base/subgrade layers
-1 - Use the bulk stress model (model 1) for base/subbase and the deviator stress model (model 2) for subgrade soil
-2 - Model number to be read in for each layer from external fileWith this information, PREMOD3 can generate a MODCOMP4 input data file for each basin (linear) or each set of basins at different load levels but the same location and time (nonlinear).
The auxiliary input files for PREMOD3 allow the user to modify the default behavior of the program and/or of MODCOMP4, as follows:
STIFBASE.DAT provides information on the desired value of depth to stiff base, if the value calculated within PREMOD3 is inappropriate, and the thickness of a top subgrade layer, if such a layer is desired.
Note 10: The internal calculation of the depth to an apparent rigid layer is based on the Texas A&M procedure by G. Rohde, which was taken from the MODULUS 4.0 program.(16)Values required are the six-character section ID, the depth to stiff base from the top of the pavement, and the thickness of an assumed "top-subgrade" layer. Space is available for comments on the origins of the values used. If no value is present for the thickness of the top subgrade layer, such a layer will not be included. If a -1. (decimal point required) is present for the depth to stiff base, no rigid base will be modeled, and the bottom (or only) subgrade will be considered of semi-infinite extent.
![]()
MODELS.DAT (used only if MODEL NUMBER above = -2) provides the number of the relationship between modulus and stress included within MODCOMP4 for each layer of the pavement system. Zero is entered for layers considered linear (e.g., asphalt, PCC). MODELS.DAT has one line per section. An example follows:
![]()
Note 11: Most of the subgrade and base layers use model 1.For the above example, model 2 (deviator stress model) was found to be a better fit for the subgrade for test section 011021, and the subbase layer (a lime-treated soil) of 014073 was found to be linear.
SENSOR.DAT provides the user an opportunity to change the association of a particular sensor with a particular layer in the pavement system from the default association provided by the program. This may improve the resultant fit and is used more often with nonlinear problems; finding the best association may require several attempts. In addition, this file is used to enter values for layer moduli that the user wishes MODCOMP4 to consider as fixed values, not subject to variation in the calculation. For each layer, input is in the form LL S EEEEE., where LL is the layer number, S is the number of the sensor to be associated with that layer, and EEEEE. is the fixed modulus for that layer. Obviously, if a fixed value is supplied, one should have no sensor associated with that layer.
Because it was desired to be able to associate a sensor with the second (lower) subgrade layer if one was created, for the purposes of this data file, that layer was given an arbitrary designation as layer 10. Because this layer did not exist at the time MODDATA was run, no seed value could then be entered for it; hence, a programming trick allows a seed (NOT a fixed value) to be entered for such a layer if the value of EEEEE. (see above) is negative. Remember that because this file is read into PREMOD3, any modulus values must be in metric units (MPa).
An example of the file follows:
![]()
Output files from PREMOD3 are named in such a way as to identify them as well as possible and to avoid duplicate names in a single directory containing as many as 5,000 separate files.
For Seasonal Monitoring Pavement (SMP) sites, the file naming convention is:
ssstttph.dmywhere:
sss = a three-character label for the seasonal site, consisting of the two-digit state code and a letter indicating the specific site within that state, obtained from a data statement within PREMOD3 correlating standard six-character SHRP_ID's to seasonal ID's. These letters are not arbitrary but have been assigned previously.ttt = a three-character label for the station at which the deflections were observed, using M in the first character if the station was negative (no negative three-digit stations were used) and prefixing two- or single-digit stations with 0 and 00, respectively.
p = a single character in alphabetic sequence indicating the number of times the present station and load height have been used so far on this particular day.
l = a single digit (0,1,3) indicating the lane in which the data was taken (0, test pit area; 1, mid-lane; 3, outer wheelpath)
d = a single character (A-Z, 1-5) indicating the day of the month of the site visit.
m = a single character (A-L) indicating the month of the site visit.
y = a single character (0-9) indicating the last digit of the year of the site visit. This convention assumed that all visits were within the same decade, which was true for the present data set.
It should be noted that the pass number p starts at A for a given SHRP_ID, date, and station, and is incremented until either the corresponding file name has not been already used, or 36 values (26 letters + 10 digits) have been attempted, in which case the program prints an error message and quits. A total of 24 cases (corresponding to six sequences of observations and four load heights at each location) should be the maximum needed. Where multiple data sets were taken at the same location on the same sequence, more values may be needed, but this is a data error and should be fixed in the data.
For nonseasonal sites the file-naming convention is:
aaaaaach.lmywhere:
aaaaaa = the full 6-character SHRP_ID of the section being studied.c = a single character (A-Z, 0-9) indicating the station at which the data was taken (for flexible sections, 21 stations are used in each lane, and for rigid sections, up to 20 stations are used for the mid-slab deflections, which are the only ones for which back-calculation is attempted).
h = a single digit (1-4) corresponding to the load height used for the current deflections, corresponding to different nominal loads (6,000; 9,000; 12,000; and 16,000 pounds).
l,m,y = (lane, month, year) as above for seasonal data file names (note that we assume there will not be two visits for non-seasonal sites in the same month, nor will there be more than one complete sequence on a single day).
Step 4: Trial Computations and Modification of Inputs
Execute MODSHELL
To begin the computation process, a limited number of points are manually selected at random along the test section to complete the back-calculation of elastic properties. The number of test points selected are generally in the range of three to eight and depend on the amount of variation of the measured deflection basins within the subsection. For test sections with "uniform" load response, three or four deflection basins should be used, whereas six to eight basins should be used for those test sections with load-response characteristics defined as "drift" or "highly variable."(1)MODSHELL is used to analyze the basins measured at those random test points. Results from these initial solutions are reviewed to determine whether the production runs should be executed or changes should be made to the inputs before proceeding to the production runs. The decision on whether to proceed is based on, in order of importance:
- The magnitude of the RMS errors -- revisions should be made until the RMS error is reduced to 2 percent or less, or to the lowest possible value.
- The computed elastic layer modulus (Young's modulus) -- revisions should be made if "extreme" (high or low) layer moduli are calculated for the type of material identified.
- Changes occur in the elastic layer modulus from one iteration to the other near the end of the computations.
If the RMS errors are found to be large (greater than 2 percent) or the calculated layer elastic moduli are questionable for the type of material, the inputs should be checked and adjustments made to the layer combinations, layer-sensor assignments, and/or the use or omission of an apparent rigid layer. MODSHELL is used to recalculate the elastic layer modulus with those changes. This iterative process is continued until "reasonable or acceptable" solutions are achieved. As stated above, a reasonable or acceptable solution is one with an RMS error less than or equal to 2 percent with elastic layer moduli that are considered typical for the material type. The revisions, if any, to the input parameters created by PREMOD are then used for the production runs.
For some test sections, extremely high or low layer moduli can be computed for one or more layers in the pavement structure with good RMS error values. If this occurs, changes should be made to the inputs and MODSHELL used to recalculate Young's modulus, as noted above. If the final RMS error is less than 2 percent for the trial runs that resulted in the extremely high or low moduli and is much greater than 2 percent for the other trial runs, the trial run resulting in the high or low moduli should be used for the production runs.
Execute Program BATCHIT
Program BATCHIT creates batch files to assist in the automated handling of the many MODCOMP4 input files generated by PREMOD3. The program is executed from the directory containing those output files (see below). BATCHIT examines the extensions of all the data files; the first batch file creates a subdirectory corresponding to each such extension below a directory specified by the user, and moves all files with that extension to that subdirectory. The second batch file causes the system to change to each of those subdirectories in turn, execute MODCOMP4 on each data file, and compress (using PKZIP) the data files and short and long output files into separate ZIP files for future reference. These ZIP files are stored in <startid>/<stateid>.The program assumes that the data files from PREMOD3 are in a directory:
<startid>\<stateid>\<seasid>where:
<startid> = an arbitrary top-level directory.
<stateid> = a subdirectory named using either a two-digit numeric FIPS (Federal Information Processing System) State code (e.g., 01, 48) or a two-character State postal identifier (e.g., AL, TX).<seasid> = in the case of seasonal FWD data this would be the three-character seasonal ID referred to above in the description of PREMOD3 output file names; for nonseasonal data, a three-character substitute was used:
__a, __b, __c, __d, etc.where the a,b,c,d are surrogates for the SHRP_ID's of sections in the current states. It would be possible to modify the program to use the full 6-character ID in this situation, if desired, but some of the later file-naming conventions assume the use of three characters here.
The program requests that the user enter the drive and the value for <startid>.
Examples of the output of BATCHIT for a nonseasonal case (011001, with three-character surrogate __A) follow:
File DO__ADIR.BAT
![]()
File DO__AMOD.BAT
![]()
File MC4.BAT
![]()
Step 5: Execute MODCOMP4 -- Back-Calculate Young's Modulus and Nonlinear Elastic Properties
Program MODCOMP4 is executed for each data file by a call to the separate batch file (MC4.BAT) shown above. It would be impossible to provide an appropriate discussion of this program in this document; it is suggested that the user refer to the documents provided with the MODCOMP4 package.(10)
It is assumed that MODCOMP4.exe is in a directory named MODCOMP4, directly off the current root directory. Upon finishing all of the basins, MC4.BAT also causes the data files, short output files, and long output files to be zipped into files whose names are made up of the seasonal section name or surrogate, therefore, the data file extension (which will be the same for all data files in that directory); and a two-character label (DT, SM, or OT) indicating data, summary or output, respectively. MC4.BAT is assumed to be located in the <startdir> of the discussion for PREMOD3.
A sample input file for a linear problem (011001A1.0J9, created by PREMOD3) follows:
![]()
The above file shows the problem identification line, the run parameters, and the fact that there are five layers, each of which is considered to have an unknown modulus. Layers 3 and 4 (counting down from the surface) are to be associated with sensors 4 and 5 (457 and 610 mm from the center of the loading plate). There is one load level, with a load of radius 0.1501 m; the following field (0. in this case) on this line permits specification of load pressure instead of total load). The load is expressed as 33.47 kN, and there are seven sensors, whose positions and readings are given. For each layer, the model is zero (linear), and the initial modulus, Poisson's ratio, density, coefficient of lateral pressure, and thickness are given, followed by zeroes for the estimates of K1 and K2 used for a known layer in a nonlinear solution.
Note 12: The "N" on the end of the second line in the data file is placed there automatically by PREMOD3. It tells MODCOMP4 not to run all load levels for a linear data set; the option of running more than one was added after PREMOD3 was written; hence, no linear data sets are written with more than one load level.Step 6: Extract Elastic Properties and Create Summary Output Files
Execute BACKSUM2
Program BACKSUM2 is run to obtain summary information from the MODCOMP4 summary (short) output files for the final iteration of linear back-calculation runs. The data desired are the SHRP_ID, the date, time, and temperature when the deflections were obtained, the location (station and lane), the load applied, the thickness and derived modulus for each layer, and the average error between the observed and predicted deflections for the final values of layer modulus. The program is run from the directory containing the ZIP files created by the second batch file and expands each SM (summary) ZIP file, obtains a directory of the summary files, and extracts the required information from each file in turn.The output for all of the summary files in a given ZIP file is written to a single file, one line per basin, whose location in the directory structure is given by a file DIRECT.NAM in the current directory and whose file name is the first six characters of the ZIP file, which is made up of the three-character seasonal ID (or its surrogate for nonseasonal sections) and the three-character data file extension. If DIRECT.NAM does not exist, the user is prompted for the need to create it, and the program is halted. The program could be modified to assume that the file DIRECT.NAM is in a standard location, instead of being in the current directory. Sample output follows:
Execute BAKSUMNL
Program BAKSUMNL does what BACKSUM2 does but for the results of nonlinear calculations. The MODCOMP4 output formats are slightly different, and the results in terms of layer modulus are given only for the highest load value for which a basin was included (remember that for nonlinear processing, the MODCOMP4 data files each contain the basins for a full four load levels done at that time and place). Sample output follows:Note that layer 1 is linear (L), the nonlinear solution for layers 2,3, and 4 is sometimes significant (S) and sometimes not (N), and layer 5 has fixed modulus (F). TAC is the asphalt mid-depth temperature, MOD is the model number assumed for the layer, and #DRP is the number of drops included in the averaged basin. Note also that, at station 400, the MODCOMP4 solution ran out of iterations before converging.
Execute BAKOUTNL
Program BAKOUTNL operates on the longer output files for nonlinear back-calculation results to obtain information not available from the shorter summary output files. Specifically, BAKOUTNL obtains, in addition to necessary identification information, the coefficients and exponents in the mathematical relation assumed by the user to hold for the particular layer material.In addition the number of the model used, Poisson's ratio, the coefficient of lateral pressure, and the density of the layer are extracted, as well as the correlation coefficient R for the regression between modulus and stress for the different load levels, showing how well the chosen model actually fits the data.
Note 13: The number obtained is R, not the R-squared that is usually used in this application.If a linear layer is included in the layer structure, the modulus obtained for that layer under the highest load is retrieved instead of the model parameters.
The program is executed for each nonlinear back-calculation, with two parameters, as shown below:
BAKOUTNL <infile> <outfile>
where <infile> is a long output file of MODCOMP4, and the output is written to <outfile> as one line per layer. Sample output follows:
Note here, for the example, that COEFF and EXP are 0.0 for the linear asphalt layer and the fixed layer.
Summary
This guide has been prepared to implement and apply existing standardized procedures (ASTM D5858 and FHWA-RD-97-076) to back-calculate Young's modulus and the nonlinear elastic properties for each pavement and subgrade layer.(1) However, the use of MODCOMP4, as well as other software packages, to calculate elastic layer properties from FWD deflection basins does not always provide reasonable solutions, because the program is not a perfect simulation of real-world conditions. Each program has limitations and inaccuracies in simulating the deflection basins.
Appendix B provides a listing of the LTPP test sections that have extensive variability and drift and those that were subdivided into two subsections. Appendix B also provides a listing of the LTPP test sections where an apparent rigid layer was used in the back-calculation process and the depth to sampling refusal from the shoulder probe drilled at each site.
Table 8. Uniformity classification of LTPP test sections (refer to figures 9-12).
Note: Those test sections not listed in table were classified as "uniform."
Consistent Change in Deflections Along the Test Section -- "Drift" (figure 11) Highly Variable Deflections Along the Test Section (figure 10) Abrupt Change in Deflections Along the Test Section (figure 12) 02 - 1004 04 - 1007 01 - 4127 --- 2+75* 02 - 6010 04 - 1016 01 - 4129 --- 2+75 04 - 1021 04 - 1025 02 - 9035 --- 2+25 04 - 1065 04 - 6054 02 - 1001 --- 2+75 06 - 8149 04 - 6055 04 - 1018 --- 0+75 06 - 8156 04 - 6060 04 - 1002 --- 1+50 08 - 2008 05 - 2042 04 - 1034 --- 1+75 08 - 7780 06 - 2002 04 - 1065 --- 2+25 13 - 4111 06 - 2004 04 - 1022 --- 2+50 15 - 1003 06 - 2040 04 - 1037 --- 2+50 16 - 1007 06 - 2041 04 - 1015 --- 2+75 16 - 9032 06 - 2053 04 - 1006 --- 3+25 17 - 9327 06 - 8201 04 - 1016 --- 2+50 21 - 1010 06 - 8202 04 - 6053 --- 2+75 21 - 6040 08 - 1057 06 - 8534 --- 3+00 26 - 1001 08 - 7781 08 - 6002 --- 3+25 27 - 1087 13 - 1001 08 - 6013 --- 1+75 28 - 3083 15 - 7080 19 - 6049 --- 3+25 30 - 7088 19 - 1044 20 - 1005 --- 1+25 34 - 1031 19 - 6150 20 - 7085 --- 2+75 37 - 1803 27 - 1085 21 - 6043 --- 3+75 37 - 1814 27 - 7090 27 - 1023 --- 2+25 37 - 2819 28 - 2807 27 - 1087 --- 1+75 37 - 2824 28 - 3082 27 - 1029 --- 0+75 38 - 2001 28 - 3085 30 - 7088 --- 1+75 40 - 1017 28 - 3089 31 - 6702 --- 0+25 40 - 6010 28 - 7012 37 - 1992 --- 1+75 42 - 1618 29 - 1010 37 - 2824 --- 2+75 45 - 1025 29 - 5403 38 - 2001 --- 2+50 47 - 3075 29 - 5413 40 - 4088 --- 1+50 48 - 1039 30 - 7076 41 - 6012 --- 3+50 48 - 1076 31 - 6700 42 - 1614 --- 2+25 48 - 1174 31 - 7040 42 - 1618 --- 3+75 49 - 1007 32 - 1020 45 - 1011 --- 1+25 49 - 1017 32 - 1021 47 - 3110 --- 3+00 51 - 1002 35 - 1002 48 - 1061 --- 4+25 51 - 1417 35 - 6033 48 - 1096 --- 3+00 51 - 1464 36 - 1011 48 - 3669 --- 1+00 51 - 2021 37 - 1024 48 - 9005 --- 2+25 81 - 1804 37 - 1040 49 - 1004 --- 2+25 37 - 1801 53 - 1002 --- 3+25 37 - 1802 53 - 6056 --- 1+00 37 - 1817 56 - 2015 --- 2+25 37 - 2825 56 - 7772 --- 1+25 40 - 4087 81 - 1805 --- 3+50 41 - 2002 81 - 2812 --- 2+25 42 - 7025 45 - 1008 45 - 7019 46 - 9106 47 - 3101 47 - 3104 47 - 6022 47 - 9025 48 - 1050 48 - 1056 48 - 1094 48 - 1109 48 - 1111 48 - 1119 48 - 1168 48 - 1181 48 - 1183 48 - 2176 48 - 3609 48 - 3679 48 - 3689 48 - 3769 48 - 3865 48 - 6079 48 - 6160 49 - 1008 50 - 1682 51 - 1423 51 - 2004 53 - 1008 53 - 1501 56 - 2017 56 - 2018 82 - 6006 87 - 1620 87 - 2812 90 - 6420
* Denotes the station number where the abrupt change in the deflections occurred.
Note: Those test sections not listed did not have a rigid layer in the back-calculation process.
State Code LTPP Test Section Identification Number Average Depth to an Apparent Rigid Layer, m Refusal Depth Noted on Boring Log, m 01 1019 6.4 7.5 01 4126 3.4 01 6019 7.6 01 B330 6.4 6.2 02 1008 7.6 02 6010 4.5 04 0113 7.6 04 0114 7.6 04 0606 1.8 04 1007 6.1 04 0115 15.2 04 0116 15.2 3.3 04 0117 15.2 04 0118 15.2 04 0119 15.2 04 0120 15.2 04 0121 15.2 04 0122 15.2 04 0123 15.2 04 0124 15.2 04 1016 15.2 04 1018 15.2 04 1025 2.0 2.1 04 1034 6.1 04 1003 15.2 04 1037 6.7 04 1062 7.6 1.4 04 1065 7.6 04 6053 15.2 04 6054 15.2 04 6055 15.2 04 6060 7.6 04 D320 15.2 04 D330 15.1 04 7613 3.2 05 2042 2.4 05 5805 0.9 05 0213 0.7 05 0214 3.7 05 0217 3.4 05 0218 3.2 05 0221 2.1 06 2002 7.6 0.4 06 2004 7.6 06 2040 15.2 06 2053 15.2 06 6044 15.2 06 7452 7.6 06 7454 15.2 06 8149 7.6 06 8153 15.2 06 8156 15.2 06 8202 15.2 06 8534 7.6 06 8535 7.6 06 2051 0.9 06 3010 1.8 06 3021 2.7 06 8151 2.4 06 8201 4.0 06 A320 7.6 06 A330 7.6 06 A350 1.1 08 1047 15.2 08 2008 1.2 08 6013 15.2 08 7036 15.2 08 7780 15.2 08 7781 6.4 08 7783 1.0 08 3032 1.6 09 1803 1.2 12 1030 15.2 12 4096 15.2 12 4106 6.0 12 4108 15.2 12 4153 8.0 12 4154 5.7 12 A330 7.6 12 0101 1.7 12 0102 2.0 12 0103 2.2 12 0104 2.2 12 0105 1.6 12 0106 2.2 12 0107 2.7 12 0108 2.3 12 0109 2.1 12 0110 2.0 12 0111 1.9 12 0112 2.3 13 0502 3.7 13 0503 5.9 13 0506 1.8 13 1031 15.2 13 3016 1.5 13 3017 3.7 13 4092 5.4 13 4111 3.6 13 4112 5.1 13 4113 15.2 13 4420 15.2 13 7028 15.2 15 1003 1.8 15 1006 15.2 16 1001 2.2 1.2 16 1007 15.2 1.8 16 A320 3.0 16 A330 3.0 16 A350 3.0 16 1005 1.8 16 1020 3.0 16 1021 0.8 16 5025 3.7 16 6027 2.0 17 1002 15.1 17 5423 15.2 17 5453 15.2 17 6050 15.2 17 7937 15.2 18 1028 3.6 18 1037 15.2 18 6012 5.1 19 6150 7.6 20 7073 15.2 20 1005 4.9 20 1006 4.9 20 3013 3.8 20 4053 3.8 21 1014 6.1 21 6040 2.6 2.6 21 1010 4.6 21 1034 3.0 21 4025 1.6 22 3056 15.2 23 1001 15.1 2.0 23 1009 2.3 23 1012 3.7 23 1028 15.2 23 7023 5.5 23 3013 2.3 24 0503 2.0 24 2805 1.1 25 1003 3.1 25 1004 3.1 26 1001 15.1 26 1012 2.5 26 7072 15.2 26 1004 2.2 27 1016 3.3 27 1018 2.3 27 1087 15.2 27 6251 2.8 27 7090 15.2 27 D330 4.0 27 D340 4.0 28 2807 15.2 28 3081 15.2 28 3082 15.2 28 3083 4.2 28 3089 15.2 28 3090 15.2 29 1005 15.2 29 1008 15.2 29 7054 15.2 29 7073 15.2 29 0707 0.9 29 0709 1.0 29 1010 2.3 29 4036 1.5 29 5473 0.6 30 0506 15.2 30 0507 15.2 5.9 30 0509 15.2 31 0120 15.2 31 0121 15.2 31 7005 15.2 31 7017 15.2 31 7040 15.2 31 7050 15.2 32 1020 7.6 32 7000 6.1 32 A310 5.9 32 A320 5.9 32 A330 5.9 32 A350 5.9 32 B310 6.1 32 B320 6.1 32 B340 6.1 32 B350 6.1 32 1030 1.5 34 1003 15.2 1.4 34 1011 2.8 34 1030 1.4 1.4 34 1033 2.6 3.0 34 1034 15.2 34 1638 15.2 34 6057 15.2 4.4 35 6033 7.6 35 6035 7.6 35 6401 7.6 35 0107 3.4 35 1002 0.5 35 1003 0.9 35 2118 5.3 35 3010 5.0 36 A310 15.2 36 A320 15.2 36 A340 15.2 36 A350 15.2 36 B310 1.5 36 B340 1.5 36 0801 4.3 36 0802 3.7 36 1644 1.5 37 1006 15.2 37 1645 15.2 37 1814 4.1 4.1 37 1024 1.4 37 1803 1.1 37 2824 1.4 37 3044 5.5 38 2001 15.2 39 7021 15.2 39 0208 6.1 39 3801 2.7 40 4154 15.2 40 6010 4.9 4.9 40 7024 1.8 1.8 40 A320 5.0 40 A340 5.0 40 A350 5.0 40 4157 1.4 40 0113 4.1 40 0114 0.2 40 0115 3.7 40 0116 0.9 40 0117 1.8 40 0118 1.2 40 0119 1.8 40 0120 2.7 40 0121 1.2 40 0122 0.8 40 0123 0.9 40 0124 5.2 42 1599 7.6 2.3 42 1605 7.6 42 1608 7.6 42 1610 15.2 42 1618 7.6 5.2 42 7025 1.7 2.3 42 7037 15.2 42 A310 15.2 42 A320 15.2 42 A330 15.2 42 A340 15.2 42 A350 15.2 42 B310 15.2 42 B330 15.2 42 B350 15.2 42 0601 2.7 42 0602 3.0 42 0605 2.9 42 0607 2.4 42 1598 1.0 42 1606 5.1 42 1613 2.7 42 9027 2.6 44 7401 4.6 45 1008 2.6 45 7019 3.7 45 3012 3.4 46 3013 1.8 46 3053 1.2 46 5020 1.8 46 9187 5.0 46 9197 2.1 47 1029 7.6 47 2001 3.8 47 2008 15.2 47 3075 5.9 47 3104 7.6 2.7 47 A310 3.7 47 A320 3.7 47 A330 3.7 47 A350 3.7 47 3101 3.7 47 3108 5.6 47 3109 1.5 47 9024 3.4 48 0001 7.6 48 1046 15.2 48 1047 7.6 48 1048 6.3 48 1049 3.3 48 1060 15.2 48 1061 7.6 48 1069 15.2 48 1070 15.2 48 1077 15.2 48 1094 7.6 48 1116 1.2 48 1130 15.2 48 1168 7.6 48 1169 6.1 48 1181 3.9 48 2172 15.2 3.4 48 2176 15.2 48 3629 7.6 48 3669 15.2 48 3679 10.9 48 3729 15.2 48 3855 7.6 48 3865 5.6 5.0 48 6086 15.1 48 6160 7.6 48 6179 2.2 48 7165 15.2 48 9005 7.6 48 B330 15.2 48 D330 15.2 48 3845 4.4 48 5035 2.4 48 5278 0.6 48 5301 1.8 48 9355 2.4 49 1004 2.4 49 1005 15.2 49 1006 6.1 49 1007 15.2 3.0 49 1017 6.3 49 0803 2.1 49 0804 1.8 50 1004 15.2 50 1681 15.2 50 1683 3.8 51 1023 15.2 51 1464 7.6 51 2004 15.2 51 2021 5.0 1.1 51 1002 1.8 51 1419 3.7 51 1423 1.2 51 0116 2.4 51 0117 1.1 51 0121 2.1 51 0122 0.9 51 0123 2.3 53 1008 15.2 53 1501 7.6 1.7 53 1801 7.6 1.1 53 1002 1.7 53 3813 1.8 53 6020 2.3 53 6049 4.3 53 7409 0.8 53 0201 3.4 53 0202 0.3 53 0203 0.7 53 0204 1.7 53 0206 2.7 53 0208 1.2 53 0209 0.4 53 0210 0.8 53 0211 0.8 53 0212 0.4 54 1640 2.1 2.1 54 7008 15.2 54 4003 2.1 54 4004 2.1 54 5007 2.1 55 6351 1.8 55 6352 1.2 55 6354 2.7 55 6355 2.1 56 2015 7.6 56 2019 15.2 56 2020 15.2 56 6029 2.5 56 A330 6.1 56 2018 5.3 56 6032 0.9 56 7775 3.0 72 4121 1.8 81 1804 9.3 81 8529 1.5 82 1005 5.5 82 6006 6.4 82 6007 3.3 83 6454 15.2 84 1684 7.6 84 1802 7.6 84 6804 6.1 84 3803 5.8 85 1801 7.6 1.4 85 1803 6.1 0.9 85 1808 7.6 0.8 86 6802 7.6 1.3 87 1620 7.6 87 1680 3.2 87 1806 2.2 87 A310 15.2 88 1645 7.6 88 1646 7.6 88 1647 7.6 89 1021 15.2 89 1125 15.2 89 1127 15.2 89 2011 15.1 89 A310 15.2 89 A320 7.6 89 A330 7.6 89 A340 7.6 89 9018 5.6 89 A901 1.8 89 A902 1.3 90 6400 3.3 90 6801 3.3
State Code SHRP Identification Number Test Date with Non-Standard Sensor Placement 5 0902 9-11-96 5 0902 9-12-96 5 0903 9-11-96 5 A601 9-13-96 5 A602 9-14-96 5 A603 9-13-96 5 A606 9-12-96 5 A606 9-13-96 5 A608 9-12-96 28 0805 9-17-96 28 0806 9-17-96 28 0902 9-18-96 28 0903 9-18-96 28 0959 9-18-96 47 3104 10-25-96 48 1092 6-29-96 48 1094 7-30-96 48 1096 7-29-96 48 1109 8-5-96 48 1122 8-1-96 48 3589 9-5-96 48 3845 8-22-96 48 5328 8-23-96 48 9005 7-31-96 48 A310 7-30-96 48 A320 7-30-96 48 A330 7-30-96 48 A340 7-30-96 48 A350 7-30-96 48 C410 8-21-96 48 C420 8-21-96 48 C420 9-4-96 48 C430 9-4-96 48 J310 8-1-96 48 J320 8-1-96 48 J330 8-1-96 48 J340 8-1-96 48 J350 8-1-96 48 K310 7-31-96 48 K320 7-31-96 48 K330 7-31-96 48 K340 8-2-96 48 K350 8-2-96 48 K351 7-31-96
Appendix C is a summary of the results from the back-calculation of elastic properties. It is subdivided into two basic parts. The first part is a tabulation of the test sections for which only a few of the deflection basins (less than 30 percent) had solutions with RMS errors less than 2 percent and the median Young's modulus for different materials and pavement cross-sections for those solutions with RMS errors of less than 2 percent. The second part includes histograms of the results from the back-calculation of Young's modulus for different pavement materials and soils.
State Code LTPP Test Section Identification Number Number of Basins Percentage of Basins with an RMS Error of Less than 2 Percent 04 0116 264 19.7 04 D320 48 2.1 04 D330 48 16.7 06 A350 107 27.1 12 A330 143 11.2 12 C350 48 8.3 16 A320 36 16.7 16 A350 36 16.7 30 0509 136 14.7 40 B350 48 18.8 56 A330 140 17.9 81 0506 48 20.8 83 0502 164 11.0 83 0503 160 27.5 83 1801 2741 24.3 02 6010 591 10.7 02 9035 156 12.2 04 1002 511 15.3 04 1015 344 17.4 04 1017 1340 11.7 04 1018 564 00.4 04 1025 556 21.8 04 1037 512 26.0 04 6054 300 26.0 04 6055 344 14.5 04 6060 348 10.6 06 2053 167 28.7 06 8149 336 21.4 08 2008 679 25.5 08 7783 344 15.7 12 4103 320 8.4 12 4135 336 00.3 12 4137 327 27.8 12 4153 340 6.5 12 4154 629 15.9 12 9054 388 21.1 13 4093 504 29.0 16 1001 340 23.8 16 1021 428 20.0 16 6027 176 00.6 18 1028 930 28.4 21 1034 583 28.1 26 1010 596 17.3 27 1016 764 11.3 28 3085 344 20.1 30 1001 508 00.2 30 6004 344 00.3 30 7075 344 21.5 30 7088 344 21.5 32 7000 344 6.1 37 1992 168 13.7 37 2819 331 22.7 45 1008 330 2.7 45 1024 427 11.2 46 9197 176 13.1 47 1028 516 20.7 47 3104 432 18.3 48 1061 176 13.1 48 1168 344 12.2 48 1169 272 15.4 48 3579 436 6.7 48 3855 328 00.3 49 1004 340 4.1 49 1005 344 4.4 49 1007 340 9.4 49 1008 344 22.1 49 1017 344 19.5 53 1008 932 14.5 53 1501 628 6.4 56 2015 176 9.1 56 2037 173 11.6 56 6029 344 00.3 56 7772 343 17.5
Material Number of Test Points Median Young's Modulus, MPa AASHTO Soil Classification A-1-a 2,106 184 AASHTO Soil Classification A-1-b 1,128 383 AASHTO Soil Classification A-2-4 1,849 197 AASHTO Soil Classification A-2-5 33 320 AASHTO Soil Classification A-2-6 250 328 AASHTO Soil Classification A-2-7 21 702 AASHTO Soil Classification A-3 1,466 240 AASHTO Soil Classification A-4 1,024 241 AASHTO Soil Classification A-5 152 1,069 AASHTO Soil Classification A-6 868 225 AASHTO Soil Classification A-7-5 85 194 AASHTO Soil Classification A-7-6 422 158 Aggregate Base and Subbase Layers Granular Base Materials 1,564 193 Aggregate Base and Subbase Layers Granular Materials, Undefined 1,224 187 Aggregate Base and Subbase Layers Granular Subbase Materials 710 152 Asphalt-Treated Base Flexible pavements 1,923 Asphalt-Treated Base Rigid pavements 1,580 Asphalt-Treated Base Semirigid 6,407 Cement-Treated Base Flexible pavements 5,352 Cement-Treated Base Rigid pavements 3,110 Cement-Treated Base Semi-rigid 1,332 HMA, Flexible Pavements Temp. = Cold 10,229 HMA, Flexible Pavements Temp. = Moderate 8,102 HMA, Flexible Pavements Temp. = Hot 4,902 HMA, Rigid Pavements Temp. = Cold 5,940 HMA, Rigid Pavements Temp. = Moderate 5,470 HMA, Rigid Pavements Temp. = Hot 3,350 HMA, Semi-rigid Pavement Temp. = Cold 15,899 HMA, Semi-rigid Pavement Temp. = Moderate 9,557 HMA, Semi-rigid Pavement Temp. = Hot 5,242
Temperature Range, Degrees C Number of Test Points Average Temperature, Degrees C HMA Young's Modulus, MPa -20 to -15 9 -17.5 70,372 -15 to -10 19 -13.3 71,927 -10 to -5 35 -7.1 49,250 -5 to 0 141 -1.6 28,802 0 to 5 315 2.9 15,063 5 to 10 683 7.9 12,745 10 to 15 1,047 12.8 11,354 15 to 20 1,135 17.4 11,639 20 to 25 1,178 22.5 9,518 25 to 30 1,010 27.3 7,484 30 to 35 710 32.4 5,815 35 to 40 392 37.1 7,473 40 to 45 112 42.0 6,229 45 to 50 21 47.5 2,316
Histograms of Back-Calculated Young's Modulus of Flexible Pavements for Subgrade Soils Separated by the AASHTO Soil Classification System:
Figure 33. BACKCAL MODULUS by A-1-a.
![]()
Figure 34. BACKCAL MODULUS by A-1-b.
![]()
Figure 35. BACKCAL MODULUS by A-2-4.
![]()
Figure 36. BACKCAL MODULUS by A-2-5.
![]()
Figure 37. BACKCAL MODULUS by A-2-6.
![]()
Figure 38. BACKCAL MODULUS by A-2-7.
![]()
Figure 39. BACKCAL MODULUS by A-3.
![]()
Figure 40. BACKCAL MODULUS by A-4.
![]()
Figure 41. BACKCAL MODULUS by A-5.<