Skip to contentUnited States Department of Transportation - Federal Highway Administration Go to TFHRC homeGo to FHWA websiteFeedback

APPENDIX B.  SUMMARY OF CONSTRUCTION DATA

Appendix B contains a summary of the construction data available for each project.  The thickness data provided from these measurements come from three different sources.  The first source is the TST_L05B table and contains the values that are considered most representative of the material that was actually placed on the section.  The second source is the SPS1_LAYER table, which includes thicknesses that should be the same as those provided in the TST_L05B table.  However, in the majority of the data shown, these thicknesses are not the same.  The third source for thickness data is the SPS1_LAYER_THICKNESS table.  These data were obtained from elevation measurements taken on the projects after the placement of each layer.

Alabama (1)
101 102 103 104 105 106 107 108 109 110 111 112 161 162 163
Required Thickness
AC Surface
178
102
102
178
102
178
102
178
178
178
102
102
     
ATB
0
0
203
305
102
203
0
0
0
102
203
305
     
PATB
0
0
0
0
0
0
102
102
102
102
102
102
     
DGAB
203
305
0
0
102
102
102
203
305
0
0
0
     
L05B Thickness
AC Surface
                             
ATB
                             
PATB
                             
DGAB
                             
SPS Construction Thickeness
AC Surface
168
99
109
170
104
188
104
185
188
170
112
99
     
ATB
0
0
185
300
102
206
0
0
0
107
201
320
     
PATB
0
0
0
0
0
0
91
107
107
97
94
84
     
DGAB
201
302
0
0
102
91
104
201
302
0
0
0
     
Rod & Level
AC Surface
174
99
108
168
105
188
103
 
188
174
113
99
     
ATB
0
0
187
299
 
206
0
 
0
107
200
320
     
PATB
0
0
0
0
 
0
93
 
107
97
93
84
     
DGAB
201
302
0
0
 
95
104
200
303
0
0
0
     
Rod & Level Std Dev
AC Surface
6
8
8
11
13
7
7
 
9
6
7
10
     
ATB
   
9
9
 
9
     
10
10
6
     
PATB
           
10
 
10
12
12
10
     
DGAB
9
8
     
8
8
13
9
           
Rod & Level Min
AC Surface
163 81 89 147 86 173 89 0 170 165 102 74      
ATB
0 0 163 284 0 188 0 0 0 91 178 305      
PATB
0 0 0 0 0 0 71 0 81 76 71 64      
DGAB
188 287 0 0 0 79 86 170 277 0 0 0      
Rod & Level Max
AC Surface
183 112 122 193 127 208 124 0 213 188 132 119      
ATB
0 0 203 320 0 224 0 0 0 127 224 335      
PATB
0 0 0 0 0 0 117 0 127 122 112 102      
DGAB
218 323 0 0 0 112 122 226 320 0 0 0      
DGAB Material Requirements
< 50% Passing #4 Sieve
  47       48 33                
< 10 % Passing #200
  12       12 8                
LL < 25
                             
PI < 4
                             
Max Lift Thickness < 6
6 6     6 6 6 6 6            
ATB Material Requirements
Hveem
Swell < 0.7 mm
                             
Stability > 35
                             
Marshall 50-blow
Flow 2 - 5 mm
                             
Stability 4.4 kN
                             
Marshall 75-blow
Flow 3 - 7.6 mm
    3 3 3         3 3 3      
Stability 10 kN
    18 18 18 18       18 18 18      
First lift thickness < 6 inches
    2 3 3 2       1 2 3      
Sub lift thickness < 4
    3 3 1 3       2 2 3      
PATB Material Requirements
                             
< 2% Passing #200
                             
2 - 2.5% Ashpalt Content
                             
Roller type (Steel Wheel)
            STEEL WHL TANDEM      
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
     
Drainage Type
1
1
1
1
1
1
6
6
6
6
6
6
     
HMAC Binder Material Requirements
Marshall
75 blows
75
75
75
75
75
75
75
75
75
75
75
75
     
Min Stability
14
14
14
14
14
14
14
14
14
14
14
14
     
Flow 2 mm - 4 mm
3
3
3
3
3
3
3
3
3
3
3
3
     

Arizona (4) 113 114 115 116 117 118 119 120 121 122 123 160 161 162 163
Required Thickness
AC Surface
102 178 178 102 178 102 178 102 102 102 178 178      
ATB
0 0 203 305 102 203 0 0 0 102 203 305      
PATB
0 0 0 0 0 0 102 102 102 102 102 102      
DGAB
203 305 0 0 102 102 102 203 305 0 0 0      
L05B Thickness
AC Surface
114 173 168 104 193 102 160 102 104 107 073 170      
ATB
0 0 216 307 107 196 0 0 0 102 201 297      
PATB
0 0 0 0 0 0 114 109 107 117 97 104      
DGAB
191 305 0 0 107 104 107 193 300 140 0 0      
SPS Construction Thickeness
AC Surface
107 180 163 94 180 94 157 107 107 102 170 173      
ATB
0 0 216 300 99 196 0 0 0 109 198 292      
PATB
0 0 0 0 0 0 114 109 107 117 97 104      
DGAB
191 305 0 0 107 109 112 185 310 0 0 0      
Rod & Level
AC Surface
107 181 163 95 180 95 157 103 106 100 170 174      
ATB
0 0 216 299 100 196 0 0 0 108 199 293      
PATB
0 0 0 0 0 0 114 109 106 116 96 105      
DGAB
191 304 0 0 108 109 113 186 311 0 0 0      
Rod & Level Std Dev
AC Surface
11 21 5 6 8 7 8 9 7 8 5 7      
ATB
    9 11 9 5       7 7 7      
PATB
            13 12 9 9 11 6      
DGAB
12 24     10 8 19 16 11            
Rod & Level Min
AC Surface
89 163 152 86 170 81 135 81 94 76 163 163      
ATB
0 0 196 284 71 183 0 0 0 97 180 274      
PATB
0 0 0 0 0 0 66 76 86 109 76 91      
DGAB
165 241 0 0 89 91 79 155 290 0 0 0      
Rod & Level Max
AC Surface
137 249 178 122 198 122 180 132 119 119 183 188      
ATB
0 0 241 338 112 208 0 0 0 117 213 310      
PATB
0 0 0 0 0 0 140 124 122 137 117 119      
DGAB
216 378 0 0 135 127 152 224 335 0 0 0      
DGAB Material Requirements
< 50% Passing #4 Sieve
          49 67 49   80          
< 10 % Passing #200           8 12 7   17          
LL < 25
                             
PI < 4
          NP NP NP   NP          
Max Lift Thickness < 6
5 7     5 5 5 5 7            
ATB Material Requirements
Hveem
Swell < 0.7 mm
                             
Stability > 35
                             
Marshall 50-blow
Flow 2 - 5 mm
    3 3 3 3         3 3      
Stability 4.4 kN
    19 19 19 19         19 19      
Marshall 75-blow
Flow 3 - 7.6 mm
                             
Stability 10 kN
                             
First lift thickness < 6 inches
    4 4 4 4       4 4 4      
Sub lift thickness < 4
    4 4   4         4 4      
PATB Material Requirements
                             
< 2% Passing #200
            3     2   3      
2 - 2.5% Ashpalt Content
            3     3   3      
Roller type (Steel Wheel)
            STEEL WHL TANDEM      
Drainage Locations
3
3
3
3
3
3
1
1
1
1
1
1
     
Drainage Type
1
1
1
1
1
1
6
6
6
6
6
6
     
HMAC Binder Material Requirements
Marshall
75 blows
                             
Min Stability
                             
Flow 2 mm - 4 mm
                             


Arkansas (4)
113 114 115 116 117 118 119 120 121 122 123 124
Required Thickness
AC Surface
102 178 178 102 178 102 178 102 102 102 178 178
ATB
0 0 203 305 102 203 0 0 0 102 203 305
PATB
0 0 0 0 0 0 102 102 102 102 102 102
DGAB
203 305 0 0 102 102 102 203 305 0 0 0
L05B Thickness
AC Surface
                       
ATB
                       
PATB
                       
DGAB
                       
SPS Construction Thickeness
AC Surface
102 165 180 102 173 102 163 97 107 112 180 175
ATB
0 0 188 290 99 198 0 0 0 99 203 287
PATB
0 0 0 0 0 0 97 86 89 102 91 91
DGAB
208 132 0 0 104 89 107 206 312 0 0 0
Rod & Level
AC Surface
64 133 123 74 129 74 135 68 62 72 147 151
ATB
0 0 184 290 98 197 0 0 0 97 202 284
PATB
0 0 0 0 0 0 97 88 89 100 91 91
DGAB
208 132 0 0 103 88 108 208 313 0 0 0
Rod & Level Std Dev
AC Surface
6 9 2 5 6 6 10 8 5 5 9 6
ATB
    10 8 6 7       12 10 10
PATB
            8 9 10 8 5 5
DGAB
8 16     7 9 13 11 15      
Rod & Level Min
AC Surface
48 102 117 64 117 64 119 48 48 61 127 135
ATB
0 0 152 269 86 180 0 0 0 25 178 262
PATB
0 0 0 0 0 0 79 51 71 86 79 76
DGAB
188 104 0 0