Appendix B contains a summary of the construction data available for each project. The thickness data provided from these measurements come from three different sources. The first source is the TST_L05B table and contains the values that are considered most representative of the material that was actually placed on the section. The second source is the SPS1_LAYER table, which includes thicknesses that should be the same as those provided in the TST_L05B table. However, in the majority of the data shown, these thicknesses are not the same. The third source for thickness data is the SPS1_LAYER_THICKNESS table. These data were obtained from elevation measurements taken on the projects after the placement of each layer.
Alabama (1) |
101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 | 111 | 112 | 161 | 162 | 163 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Required Thickness |
|||||||||||||||
AC Surface |
178 |
102 |
102 |
178 |
102 |
178 |
102 |
178 |
178 |
178 |
102 |
102 |
|||
ATB |
0 |
0 |
203 |
305 |
102 |
203 |
0 |
0 |
0 |
102 |
203 |
305 |
|||
PATB |
0 |
0 |
0 |
0 |
0 |
0 |
102 |
102 |
102 |
102 |
102 |
102 |
|||
DGAB |
203 |
305 |
0 |
0 |
102 |
102 |
102 |
203 |
305 |
0 |
0 |
0 |
|||
L05B Thickness |
|||||||||||||||
AC Surface |
|||||||||||||||
ATB |
|||||||||||||||
PATB |
|||||||||||||||
DGAB |
|||||||||||||||
SPS Construction Thickeness |
|||||||||||||||
AC Surface |
168 |
99 |
109 |
170 |
104 |
188 |
104 |
185 |
188 |
170 |
112 |
99 |
|||
ATB |
0 |
0 |
185 |
300 |
102 |
206 |
0 |
0 |
0 |
107 |
201 |
320 |
|||
PATB |
0 |
0 |
0 |
0 |
0 |
0 |
91 |
107 |
107 |
97 |
94 |
84 |
|||
DGAB |
201 |
302 |
0 |
0 |
102 |
91 |
104 |
201 |
302 |
0 |
0 |
0 |
|||
Rod & Level |
|||||||||||||||
AC Surface |
174 |
99 |
108 |
168 |
105 |
188 |
103 |
188 |
174 |
113 |
99 |
||||
ATB |
0 |
0 |
187 |
299 |
206 |
0 |
0 |
107 |
200 |
320 |
|||||
PATB |
0 |
0 |
0 |
0 |
0 |
93 |
107 |
97 |
93 |
84 |
|||||
DGAB |
201 |
302 |
0 |
0 |
95 |
104 |
200 |
303 |
0 |
0 |
0 |
||||
Rod & Level Std Dev |
|||||||||||||||
AC Surface |
6 |
8 |
8 |
11 |
13 |
7 |
7 |
9 |
6 |
7 |
10 |
||||
ATB |
9 |
9 |
9 |
10 |
10 |
6 |
|||||||||
PATB |
10 |
10 |
12 |
12 |
10 |
||||||||||
DGAB |
9 |
8 |
8 |
8 |
13 |
9 |
|||||||||
Rod & Level Min |
|||||||||||||||
AC Surface |
163 | 81 | 89 | 147 | 86 | 173 | 89 | 0 | 170 | 165 | 102 | 74 | |||
ATB |
0 | 0 | 163 | 284 | 0 | 188 | 0 | 0 | 0 | 91 | 178 | 305 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 71 | 0 | 81 | 76 | 71 | 64 | |||
DGAB |
188 | 287 | 0 | 0 | 0 | 79 | 86 | 170 | 277 | 0 | 0 | 0 | |||
Rod & Level Max |
|||||||||||||||
AC Surface |
183 | 112 | 122 | 193 | 127 | 208 | 124 | 0 | 213 | 188 | 132 | 119 | |||
ATB |
0 | 0 | 203 | 320 | 0 | 224 | 0 | 0 | 0 | 127 | 224 | 335 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 117 | 0 | 127 | 122 | 112 | 102 | |||
DGAB |
218 | 323 | 0 | 0 | 0 | 112 | 122 | 226 | 320 | 0 | 0 | 0 | |||
DGAB Material Requirements |
|||||||||||||||
< 50% Passing #4 Sieve |
47 | 48 | 33 | ||||||||||||
< 10 % Passing #200 |
12 | 12 | 8 | ||||||||||||
LL < 25 |
|||||||||||||||
PI < 4 |
|||||||||||||||
Max Lift Thickness < 6 |
6 | 6 | 6 | 6 | 6 | 6 | 6 | ||||||||
ATB Material Requirements |
|||||||||||||||
Hveem |
|||||||||||||||
Swell < 0.7 mm |
|||||||||||||||
Stability > 35 |
|||||||||||||||
Marshall 50-blow |
|||||||||||||||
Flow 2 - 5 mm |
|||||||||||||||
Stability 4.4 kN |
|||||||||||||||
Marshall 75-blow |
|||||||||||||||
Flow 3 - 7.6 mm |
3 | 3 | 3 | 3 | 3 | 3 | |||||||||
Stability 10 kN |
18 | 18 | 18 | 18 | 18 | 18 | 18 | ||||||||
First lift thickness < 6 inches |
2 | 3 | 3 | 2 | 1 | 2 | 3 | ||||||||
Sub lift thickness < 4 |
3 | 3 | 1 | 3 | 2 | 2 | 3 | ||||||||
PATB Material Requirements |
|||||||||||||||
< 2% Passing #200 |
|||||||||||||||
2 - 2.5% Ashpalt Content |
|||||||||||||||
Roller type (Steel Wheel) |
STEEL WHL TANDEM | ||||||||||||||
Drainage Locations |
3 |
3 |
3 |
3 |
3 |
3 |
1 |
1 |
1 |
1 |
1 |
1 |
|||
Drainage Type |
1 |
1 |
1 |
1 |
1 |
1 |
6 |
6 |
6 |
6 |
6 |
6 |
|||
HMAC Binder Material Requirements |
|||||||||||||||
Marshall |
|||||||||||||||
75 blows |
75 |
75 |
75 |
75 |
75 |
75 |
75 |
75 |
75 |
75 |
75 |
75 |
|||
Min Stability |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
14 |
|||
Flow 2 mm - 4 mm |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
3 |
|||
| Arizona (4) | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 160 | 161 | 162 | 163 |
Required Thickness |
|||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
AC Surface |
102 | 178 | 178 | 102 | 178 | 102 | 178 | 102 | 102 | 102 | 178 | 178 | |||
ATB |
0 | 0 | 203 | 305 | 102 | 203 | 0 | 0 | 0 | 102 | 203 | 305 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 102 | 102 | 102 | 102 | 102 | 102 | |||
DGAB |
203 | 305 | 0 | 0 | 102 | 102 | 102 | 203 | 305 | 0 | 0 | 0 | |||
L05B Thickness |
|||||||||||||||
AC Surface |
114 | 173 | 168 | 104 | 193 | 102 | 160 | 102 | 104 | 107 | 073 | 170 | |||
ATB |
0 | 0 | 216 | 307 | 107 | 196 | 0 | 0 | 0 | 102 | 201 | 297 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 114 | 109 | 107 | 117 | 97 | 104 | |||
DGAB |
191 | 305 | 0 | 0 | 107 | 104 | 107 | 193 | 300 | 140 | 0 | 0 | |||
SPS Construction Thickeness |
|||||||||||||||
AC Surface |
107 | 180 | 163 | 94 | 180 | 94 | 157 | 107 | 107 | 102 | 170 | 173 | |||
ATB |
0 | 0 | 216 | 300 | 99 | 196 | 0 | 0 | 0 | 109 | 198 | 292 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 114 | 109 | 107 | 117 | 97 | 104 | |||
DGAB |
191 | 305 | 0 | 0 | 107 | 109 | 112 | 185 | 310 | 0 | 0 | 0 | |||
Rod & Level |
|||||||||||||||
AC Surface |
107 | 181 | 163 | 95 | 180 | 95 | 157 | 103 | 106 | 100 | 170 | 174 | |||
ATB |
0 | 0 | 216 | 299 | 100 | 196 | 0 | 0 | 0 | 108 | 199 | 293 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 114 | 109 | 106 | 116 | 96 | 105 | |||
DGAB |
191 | 304 | 0 | 0 | 108 | 109 | 113 | 186 | 311 | 0 | 0 | 0 | |||
Rod & Level Std Dev |
|||||||||||||||
AC Surface |
11 | 21 | 5 | 6 | 8 | 7 | 8 | 9 | 7 | 8 | 5 | 7 | |||
ATB |
9 | 11 | 9 | 5 | 7 | 7 | 7 | ||||||||
PATB |
13 | 12 | 9 | 9 | 11 | 6 | |||||||||
DGAB |
12 | 24 | 10 | 8 | 19 | 16 | 11 | ||||||||
Rod & Level Min |
|||||||||||||||
AC Surface |
89 | 163 | 152 | 86 | 170 | 81 | 135 | 81 | 94 | 76 | 163 | 163 | |||
ATB |
0 | 0 | 196 | 284 | 71 | 183 | 0 | 0 | 0 | 97 | 180 | 274 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 66 | 76 | 86 | 109 | 76 | 91 | |||
DGAB |
165 | 241 | 0 | 0 | 89 | 91 | 79 | 155 | 290 | 0 | 0 | 0 | |||
Rod & Level Max |
|||||||||||||||
AC Surface |
137 | 249 | 178 | 122 | 198 | 122 | 180 | 132 | 119 | 119 | 183 | 188 | |||
ATB |
0 | 0 | 241 | 338 | 112 | 208 | 0 | 0 | 0 | 117 | 213 | 310 | |||
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 140 | 124 | 122 | 137 | 117 | 119 | |||
DGAB |
216 | 378 | 0 | 0 | 135 | 127 | 152 | 224 | 335 | 0 | 0 | 0 | |||
DGAB Material Requirements |
|||||||||||||||
< 50% Passing #4 Sieve |
49 | 67 | 49 | 80 | |||||||||||
| < 10 % Passing #200 | 8 | 12 | 7 | 17 | |||||||||||
LL < 25 |
|||||||||||||||
PI < 4 |
NP | NP | NP | NP | |||||||||||
Max Lift Thickness < 6 |
5 | 7 | 5 | 5 | 5 | 5 | 7 | ||||||||
ATB Material Requirements |
|||||||||||||||
Hveem |
|||||||||||||||
Swell < 0.7 mm |
|||||||||||||||
Stability > 35 |
|||||||||||||||
Marshall 50-blow |
|||||||||||||||
Flow 2 - 5 mm |
3 | 3 | 3 | 3 | 3 | 3 | |||||||||
Stability 4.4 kN |
19 | 19 | 19 | 19 | 19 | 19 | |||||||||
Marshall 75-blow |
|||||||||||||||
Flow 3 - 7.6 mm |
|||||||||||||||
Stability 10 kN |
|||||||||||||||
First lift thickness < 6 inches |
4 | 4 | 4 | 4 | 4 | 4 | 4 | ||||||||
Sub lift thickness < 4 |
4 | 4 | 4 | 4 | 4 | ||||||||||
PATB Material Requirements |
|||||||||||||||
< 2% Passing #200 |
3 | 2 | 3 | ||||||||||||
2 - 2.5% Ashpalt Content |
3 | 3 | 3 | ||||||||||||
Roller type (Steel Wheel) |
STEEL WHL TANDEM | ||||||||||||||
Drainage Locations |
3 |
3 |
3 |
3 |
3 |
3 |
1 |
1 |
1 |
1 |
1 |
1 |
|||
Drainage Type |
1 |
1 |
1 |
1 |
1 |
1 |
6 |
6 |
6 |
6 |
6 |
6 |
|||
| HMAC Binder Material Requirements | |||||||||||||||
| Marshall | |||||||||||||||
75 blows |
|||||||||||||||
Min Stability |
|||||||||||||||
Flow 2 mm - 4 mm |
|||||||||||||||
Arkansas (4) |
113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 124 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
Required Thickness |
||||||||||||
AC Surface |
102 | 178 | 178 | 102 | 178 | 102 | 178 | 102 | 102 | 102 | 178 | 178 |
ATB |
0 | 0 | 203 | 305 | 102 | 203 | 0 | 0 | 0 | 102 | 203 | 305 |
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 102 | 102 | 102 | 102 | 102 | 102 |
DGAB |
203 | 305 | 0 | 0 | 102 | 102 | 102 | 203 | 305 | 0 | 0 | 0 |
L05B Thickness |
||||||||||||
AC Surface |
||||||||||||
ATB |
||||||||||||
PATB |
||||||||||||
DGAB |
||||||||||||
SPS Construction Thickeness |
||||||||||||
AC Surface |
102 | 165 | 180 | 102 | 173 | 102 | 163 | 97 | 107 | 112 | 180 | 175 |
ATB |
0 | 0 | 188 | 290 | 99 | 198 | 0 | 0 | 0 | 99 | 203 | 287 |
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 97 | 86 | 89 | 102 | 91 | 91 |
DGAB |
208 | 132 | 0 | 0 | 104 | 89 | 107 | 206 | 312 | 0 | 0 | 0 |
Rod & Level |
||||||||||||
AC Surface |
64 | 133 | 123 | 74 | 129 | 74 | 135 | 68 | 62 | 72 | 147 | 151 |
ATB |
0 | 0 | 184 | 290 | 98 | 197 | 0 | 0 | 0 | 97 | 202 | 284 |
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 97 | 88 | 89 | 100 | 91 | 91 |
DGAB |
208 | 132 | 0 | 0 | 103 | 88 | 108 | 208 | 313 | 0 | 0 | 0 |
Rod & Level Std Dev |
||||||||||||
AC Surface |
6 | 9 | 2 | 5 | 6 | 6 | 10 | 8 | 5 | 5 | 9 | 6 |
ATB |
10 | 8 | 6 | 7 | 12 | 10 | 10 | |||||
PATB |
8 | 9 | 10 | 8 | 5 | 5 | ||||||
DGAB |
8 | 16 | 7 | 9 | 13 | 11 | 15 | |||||
Rod & Level Min |
||||||||||||
AC Surface |
48 | 102 | 117 | 64 | 117 | 64 | 119 | 48 | 48 | 61 | 127 | 135 |
ATB |
0 | 0 | 152 | 269 | 86 | 180 | 0 | 0 | 0 | 25 | 178 | 262 |
PATB |
0 | 0 | 0 | 0 | 0 | 0 | 79 | 51 | 71 | 86 | 79 | 76 |
DGAB |
188 | 104 | 0 | 0 | ||||||||