The following new research studies reported by the Federal Highway Administration's (FHWA) Office of Research and Development are sponsored in whole or in part with federal highway funds. For further details on a particular study, please contact Martha Soneira, editor of Public Roads, martha.soneira@fhwa.dot.gov.
Objectives: To examine the highway safety data collection and analysis process and to develop and implement a user-friendly system. For each potential system, the study will outline the scope of the system, review the state of knowledge in the area, critique any previous system development efforts, and assess the potential benefits. For the most promising system, a prototype development effort will be undertaken.
Contractor: Calspan Corp.
Expected Completion Date: October 1997
Estimated
Cost: $306,880
Objectives: To evaluate, through laboratory studies with field verification, the traffic control devices and operational aspects of construction and maintenance zones. Drivers of all ages will be studied, but the needs and capabilities of older drivers will be emphasized. Problems will be identified, and countermeasures will be developed and tested.
Contractor: Performance, Safety, and Health
Expected Completion Date: September
1997
Estimated Cost: $422,263
Objectives: To conduct front-end analyses and development of: (1) design requirements and specification for a prototype driver performance model to aid in the development and evaluation of new highway designs, and (2) functional analyses and input-output requirements for the model.
Contractor: BBN Systems and Technologies
Expected Completion Date: February
1996
Estimated Cost: $525,770
Objective: To develop an improved mechanistic subgrade failure criterion for designing new and reconstructed pavements.
Contractor: Danish Road Institute
Estimated Cost: $525,770
Expected Completion
Date: December 1996
Estimated Cost: $309,514
Objectives: To develop and test new local non-destructive evaluation systems for optimum performance during routine highway bridge inspection. The new optimized systems will include radiography, ultrasound, magnetic leakage, etc.
Contractor: Department of Energy (Interagency Agreement)
Expected Completion
Date: August 1996
Estimated Cost: $1,326,000
Objective: To identify research opportunities in innovative materials or processing technologies that can produce better performance than existing types of portland cement concrete.
Contractor: National Academy of Sciences
Expected Completion Date: December
1996
Estimated Cost: $251,000
Objectives: To compile a clearinghouse of references, abstracts, and full-text documents to simplify searches for existing research in transportation planning and to establish a transportation modeling bulletin board and home page on the Internet.
Contractor: Texas Transportation Institute
Expected Completion Date: Ongoing
Estimated
Cost: $350,000 (for FY 1995)
|