APPENDIX C. DETAILED EVALUATION RESULTS
This appendix presents the detailed results of the evaluation of the effectiveness of
left- and right-turn lane improvement projects performed in this study. The results for
the yoked comparison (YC), comparison group (CG), and Empirical Bayes (EB)
approaches are presented separately. This appendix presents the results of all evaluations
that were performed. Only those results that were found to be statistically significant are
presented and interpreted in the main text of this report (see section 6).
Yoked Comparison Evaluations
The results of the YC evaluations performed in this study are presented in tables C-1
through C-10. These tables include the results for four specific dependent variables, two
different target areas, and two different types of analysis approaches.
The YC approach to before-after evaluation has been described conceptually in
section 5 of this report. The procedures presented in that section were used to obtain the
analysis results in tables C-1 through C-10. These analyses involved one-to-one
matching of treatment and similar unimproved comparison sites. Two analyses presented
below involved only treatment site data; in this approach, the project-related accidents for
the treatment site were evaluated using the non-project-related accidents for that same
site as the "comparison site" data. These were referred to as auto-matching analyses.
Description of Results Tables
Each of the tables of YC results presents the results of a set of similar YC evaluation
for a specific dependent variable, target area, and analysis type. Each row in a table
presents the results of the evaluation performed for a specific type of improvement
project. The following discussion guides the interpretation of individual columns in
these tables.
Area type. The first column for each row of the table identifies
the area type for the intersections evaluated. The codes used in this column
are:
R = rural
U = urban
Traffic control: The second column identifies the type of
traffic control at the intersections evaluated. The codes used in this column
are:
N = Newly signalized intersection
S = Signalized intersection
U = Unsignalized intersection
Table C-1. Yoked Comparison Evaluation Results
for Total Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved
sites |
Percent change
in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
-70.31 |
-35.15 |
7.60 |
-44.56 |
-9.52 |
4.63 |
-2.37 |
SIG |
0.39 |
Yes |
| R |
N |
LR |
4 |
1 |
8.58 |
4.29 |
65.60 |
-44.92 |
529.83 |
0.07 |
0.07 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
-10.38 |
-5.19 |
20.07 |
-31.38 |
57.82 |
0.26 |
-0.24 |
n/a |
|
n/a |
| R |
S |
XL |
3 |
2 |
-27.76 |
-27.76 |
54.20 |
-83.40 |
214.40 |
0.51 |
-0.43 |
NS |
0.41 |
Yes |
| R |
S |
XL |
4 |
3 |
-30.64 |
-30.64 |
27.62 |
-68.21 |
51.37 |
1.11 |
-0.92 |
NS |
0.87 |
Yes |
| R |
S |
XLR |
4 |
1 |
-44.32 |
-11.08 |
7.85 |
-20.39 |
17.07 |
1.41 |
-1.04 |
n/a |
|
n/a |
| R |
U |
L |
3 |
31 |
-63.68 |
-63.68 |
7.21 |
-75.39 |
-46.41 |
8.83 |
-5.10 |
SIG |
0.20 |
Yes |
| R |
U |
L |
4 |
21 |
-58.08 |
-32.10 |
4.70 |
-39.70 |
-20.78 |
6.83 |
-4.28 |
SIG |
0.04 |
No |
| R |
U |
LR |
3 |
11 |
-56.64 |
-44.50 |
15.08 |
-64.27 |
2.57 |
2.95 |
-1.89 |
NS |
0.76 |
Yes |
| R |
U |
LR |
4 |
12 |
1.96 |
0.98 |
13.39 |
-19.53 |
35.31 |
0.07 |
0.07 |
NS |
0.74 |
Yes |
| R |
U |
R |
3 |
11 |
88.66 |
88.66 |
77.59 |
-15.75 |
322.45 |
1.14 |
1.54 |
NS |
0.86 |
Yes |
| R |
U |
R |
4 |
27 |
-23.91 |
-15.37 |
10.99 |
-32.80 |
11.69 |
1.40 |
-1.22 |
NS |
0.86 |
Yes |
| R |
U |
XL |
4 |
1 |
82.06 |
82.06 |
222.08 |
-83.33 |
1,888.76 |
0.37 |
0.49 |
n/a |
|
n/a |
| U |
N |
L |
3 |
4 |
-30.29 |
-20.19 |
14.09 |
-41.01 |
17.52 |
1.43 |
-1.19 |
NS |
0.02 |
No |
| U |
N |
L |
4 |
24 |
-43.77 |
-22.35 |
3.18 |
-27.95 |
-15.39 |
7.03 |
-5.20 |
SIG |
0.03 |
No |
| U |
S |
L |
3 |
3 |
-32.62 |
-32.62 |
30.80 |
-72.49 |
65.08 |
1.06 |
-0.86 |
NS |
0.18 |
Yes |
| U |
S |
L |
4 |
33 |
-42.00 |
-12.95 |
1.16 |
-15.09 |
-10.53 |
11.17 |
-8.40 |
SIG |
0.00 |
No |
| U |
S |
LR |
4 |
9 |
-21.25 |
-5.46 |
2.20 |
-9.35 |
-0.65 |
2.48 |
-2.20 |
SIG |
0.01 |
No |
| U |
S |
R |
3 |
1 |
-36.52 |
-18.26 |
15.54 |
-37.84 |
32.85 |
1.18 |
-0.93 |
n/a |
|
n/a |
| U |
S |
R |
4 |
14 |
-13.65 |
-6.82 |
4.23 |
-14.37 |
2.32 |
1.61 |
-1.50 |
NS |
0.00 |
No |
| U |
S |
XL |
3 |
1 |
-25.11 |
-25.11 |
43.24 |
-75.85 |
132.21 |
0.58 |
-0.50 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
2 |
14.95 |
9.97 |
15.24 |
-14.77 |
46.50 |
0.65 |
0.70 |
NS |
0.80 |
Yes |
| U |
U |
L |
3 |
10 |
-36.55 |
-36.55 |
17.52 |
-63.07 |
9.00 |
2.09 |
-1.65 |
NS |
0.28 |
Yes |
| U |
U |
L |
4 |
8 |
-70.46 |
-35.23 |
2.92 |
-39.97 |
-28.24 |
12.07 |
-6.17 |
SIG |
0.63 |
Yes |
| U |
U |
LR |
4 |
1 |
-0.85 |
-0.42 |
37.06 |
-38.55 |
164.58 |
-0.01 |
0.01 |
n/a |
|
n/a |
| U |
U |
R |
4 |
1 |
22.76 |
22.76 |
228.29 |
-96.79 |
4,599.26 |
0.10 |
0.11 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-2. Yoked Comparison Evaluation Results
for Fatal and Injury Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
-82.61 |
-41.31 |
6.58 |
-48.03 |
-11.64 |
6.27 |
-2.31 |
SIG |
0.69 |
Yes |
| R |
N |
LR |
4 |
1 |
-3.95 |
-1.97 |
61.88 |
-46.16 |
550.18 |
0.03 |
-0.03 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
-2.86 |
-1.43 |
32.03 |
-36.67 |
126.92 |
0.04 |
-0.04 |
n/a |
|
n/a |
| R |
S |
XL |
3 |
2 |
-35.44 |
-35.44 |
63.34 |
-90.56 |
341.70 |
0.56 |
-0.45 |
NS |
0.72 |
Yes |
| R |
S |
XL |
4 |
3 |
63.45 |
63.45 |
85.33 |
-41.25 |
354.74 |
0.74 |
0.94 |
NS |
0.98 |
Yes |
| R |
S |
XLR |
4 |
1 |
18.67 |
4.67 |
24.66 |
-19.18 |
126.30 |
0.19 |
0.21 |
n/a |
|
n/a |
| R |
U |
L |
3 |
34 |
-58.55 |
-58.55 |
11.78 |
-76.26 |
-27.63 |
4.97 |
-3.10 |
SIG |
0.78 |
Yes |
| R |
U |
L |
4 |
22 |
-70.41 |
-39.72 |
4.85 |
-46.97 |
-26.90 |
8.18 |
-4.19 |
SIG |
0.88 |
Yes |
| R |
U |
LR |
3 |
11 |
-51.67 |
-40.60 |
22.18 |
-66.48 |
40.71 |
1.83 |
-1.25 |
NS |
0.99 |
Yes |
| R |
U |
LR |
4 |
14 |
-7.72 |
-3.86 |
16.19 |
-26.80 |
41.77 |
0.24 |
-0.23 |
NS |
0.98 |
Yes |
| R |
U |
R |
3 |
11 |
18.83 |
18.83 |
62.88 |
-57.88 |
235.23 |
0.30 |
-0.33 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
28 |
-22.28 |
-14.51 |
15.09 |
-36.91 |
25.69 |
0.96 |
-0.85 |
NS |
0.94 |
Yes |
| R |
U |
XL |
4 |
2 |
156.22 |
156.22 |
335.09 |
-80.26 |
3,225.51 |
0.47 |
0.72 |
NS |
0.27 |
Yes |
| U |
N |
L |
3 |
4 |
-10.57 |
-7.04 |
28.32 |
-43.17 |
84.60 |
0.25 |
-0.24 |
NS |
0.11 |
Yes |
| U |
N |
L |
4 |
23 |
-42.68 |
-21.81 |
5.40 |
-30.70 |
-9.05 |
4.04 |
-3.02 |
SIG |
0.67 |
Yes |
| U |
S |
L |
3 |
3 |
-41.97 |
-41.97 |
40.03 |
-84.99 |
124.28 |
1.05 |
-0.79 |
NS |
0.25 |
Yes |
| U |
S |
L |
4 |
35 |
-39.35 |
-12.41 |
2.04 |
-16.01 |
-7.96 |
6.08 |
-4.69 |
SIG |
0.00 |
No |
| U |
S |
LR |
4 |
8 |
-27.75 |
-7.16 |
3.75 |
-13.23 |
1.84 |
1.91 |
-1.62 |
NS |
0.36 |
Yes |
| U |
S |
R |
3 |
1 |
-74.25 |
-37.13 |
12.09 |
-47.96 |
31.17 |
3.07 |
-1.44 |
n/a |
|
n/a |
| U |
S |
R |
4 |
12 |
-20.22 |
-9.71 |
7.22 |
-21.54 |
7.41 |
1.34 |
-1.20 |
NS |
0.38 |
Yes |
| U |
S |
XL |
3 |
1 |
-0.14 |
-0.14 |
99.86 |
-85.93 |
608.91 |
0.00 |
0.00 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
3 |
-7.71 |
-4.62 |
19.19 |
-31.92 |
49.21 |
0.24 |
-0.23 |
NS |
0.14 |
Yes |
| U |
U |
L |
3 |
10 |
-41.59 |
-41.59 |
24.13 |
-74.01 |
31.27 |
1.72 |
-1.30 |
NS |
0.67 |
Yes |
| U |
U |
L |
4 |
8 |
-79.48 |
-39.74 |
3.04 |
-44.26 |
-31.65 |
13.06 |
-5.34 |
SIG |
0.93 |
Yes |
| U |
U |
LR |
4 |
1 |
-73.75 |
-36.88 |
18.17 |
-49.13 |
147.92 |
2.03 |
-0.97 |
n/a |
|
n/a |
| U |
U |
R |
4 |
1 |
84.14 |
84.14 |
379.61 |
-96.76 |
10,370.69 |
0.22 |
0.30 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-3. Yoked Comparison Evaluation Results
for Project-Related Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
-33.84 |
-16.92 |
44.21 |
-47.59 |
404.14 |
0.38 |
-0.31 |
NS |
1.00 |
Yes |
| R |
N |
LR |
4 |
1 |
-47.97 |
-23.99 |
68.83 |
-49.85 |
4,598.55 |
0.35 |
-0.25 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
0.01 |
0.00 |
141.41 |
-49.80 |
12,730.59 |
0.00 |
0.00 |
n/a |
|
n/a |
| R |
S |
XL |
3 |
2 |
-7.57 |
-7.57 |
184.85 |
-98.17 |
4,558.33 |
0.04 |
-0.04 |
NS |
0.98 |
Yes |
| R |
S |
XL |
4 |
4 |
23.06 |
23.06 |
119.45 |
-81.64 |
724.77 |
0.19 |
0.21 |
NS |
0.99 |
Yes |
| R |
S |
XLR |
4 |
1 |
-2.90 |
-0.73 |
47.01 |
-24.45 |
1,055.24 |
0.02 |
-0.02 |
n/a |
|
n/a |
| R |
U |
L |
3 |
34 |
-1.04 |
-1.04 |
47.90 |
-61.68 |
155.56 |
0.02 |
-0.02 |
NS |
1.00 |
Yes |
| R |
U |
L |
4 |
23 |
-38.43 |
-21.56 |
16.71 |
-42.72 |
33.06 |
1.29 |
-1.00 |
NS |
1.00 |
Yes |
| R |
U |
LR |
3 |
12 |
-15.23 |
-12.18 |
53.44 |
-65.53 |
237.78 |
0.23 |
-0.21 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
15 |
68.38 |
34.19 |
44.25 |
-19.95 |
185.88 |
0.77 |
0.99 |
NS |
0.95 |
Yes |
| R |
U |
R |
3 |
11 |
4.90 |
4.90 |
89.46 |
-80.28 |
458.06 |
0.05 |
0.06 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
28 |
-7.41 |
-4.83 |
28.83 |
-41.50 |
88.81 |
0.17 |
-0.16 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
50.26 |
50.26 |
242.29 |
-93.63 |
3,443.23 |
0.21 |
0.25 |
NS |
0.57 |
Yes |
| U |
N |
L |
3 |
4 |
-32.95 |
-21.97 |
59.60 |
-63.39 |
543.20 |
0.37 |
-0.30 |
NS |
0.99 |
Yes |
| U |
N |
L |
4 |
26 |
22.55 |
11.73 |
23.61 |
-21.17 |
79.74 |
0.50 |
0.55 |
NS |
0.76 |
Yes |
| U |
S |
L |
3 |
3 |
0.06 |
0.06 |
155.01 |
-95.20 |
1,984.29 |
0.00 |
0.00 |
NS |
1.00 |
Yes |
| U |
S |
L |
4 |
35 |
-39.09 |
-12.55 |
3.17 |
-17.87 |
-5.25 |
3.96 |
-3.06 |
SIG |
0.53 |
Yes |
| U |
S |
LR |
3 |
2 |
222.83 |
148.55 |
351.45 |
-57.90 |
5,216.77 |
0.42 |
0.72 |
NS |
0.96 |
Yes |
| U |
S |
LR |
4 |
7 |
-59.77 |
-15.50 |
2.24 |
-19.09 |
-10.02 |
6.90 |
-4.23 |
SIG |
0.84 |
Yes |
| U |
S |
R |
3 |
1 |
-46.90 |
-23.45 |
35.12 |
-48.01 |
304.93 |
0.67 |
-0.48 |
n/a |
|
n/a |
| U |
S |
R |
4 |
13 |
9.10 |
5.38 |
19.84 |
-23.82 |
58.74 |
0.27 |
0.28 |
NS |
0.00 |
No |
| U |
S |
XL |
3 |
1 |
299.43 |
299.43 |
1,018.34 |
-97.30 |
59,004.76 |
0.29 |
0.54 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
2 |
5.15 |
3.44 |
118.54 |
-64.12 |
1861.12 |
0.03 |
0.03 |
NS |
0.78 |
Yes |
| U |
U |
L |
3 |
10 |
12.61 |
12.61 |
100.01 |
-80.25 |
542.02 |
0.13 |
0.13 |
NS |
1.00 |
Yes |
| U |
U |
L |
4 |
8 |
-78.97 |
-39.49 |
4.87 |
-45.76 |
23.93 |
8.11 |
-3.37 |
SIG |
0.57 |
Yes |
| U |
U |
LR |
4 |
1 |
162.46 |
81.23 |
215.63 |
-44.76 |
3236.40 |
0.38 |
0.59 |
n/a |
|
n/a |
| U |
U |
R |
4 |
1 |
-7.93 |
-7.93 |
260.41 |
-99.64 |
23,435.42 |
0.03 |
-0.03 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-4. Yoked Comparison Evaluation for Project-Related
Fatal and Injury Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
-28.78 |
-14.39 |
57.63 |
-48.51 |
799.48 |
0.25 |
-0.21 |
NS |
0.83 |
Yes |
| R |
N |
LR |
4 |
1 |
-47.97 |
-23.99 |
68.83 |
-49.85 |
4,598.55 |
0.35 |
-0.25 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
-0.01 |
0.00 |
141.41 |
-49.80 |
12,730.59 |
0.00 |
0.00 |
n/a |
|
n/a |
| R |
S |
XL |
3 |
2 |
-7.57 |
-7.57 |
184.85 |
-98.17 |
4,558.33 |
0.04 |
-0.04 |
NS |
0.98 |
Yes |
| R |
S |
XL |
4 |
4 |
177.73 |
177.73 |
311.15 |
-69.10 |
2,396.19 |
0.57 |
0.91 |
NS |
0.86 |
Yes |
| R |
S |
XLR |
4 |
1 |
45.65 |
11.41 |
80.05 |
-24.51 |
2,682.84 |
0.14 |
0.17 |
n/a |
|
n/a |
| R |
U |
L |
3 |
34 |
1.31 |
1.31 |
49.14 |
-60.85 |
162.14 |
0.03 |
0.03 |
NS |
1.00 |
Yes |
| R |
U |
L |
4 |
23 |
-36.33 |
-20.38 |
18.87 |
-43.42 |
44.50 |
1.08 |
-0.85 |
NS |
1.00 |
Yes |
| R |
U |
LR |
3 |
12 |
-17.33 |
-13.87 |
53.37 |
-66.40 |
241.59 |
0.26 |
-0.24 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
15 |
-4.91 |
2.46 |
30.40 |
-36.42 |
116.47 |
0.08 |
-0.08 |
NS |
1.00 |
Yes |
| R |
U |
R |
3 |
11 |
4.90 |
4.90 |
89.46 |
-80.28 |
458.06 |
0.05 |
0.06 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
28 |
-4.40 |
-2.87 |
31.87 |
-42.30 |
104.69 |
0.09 |
-0.09 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
143.69 |
143.69 |
451.22 |
-93.53 |
9,082.86 |
0.32 |
0.48 |
NS |
0.73 |
Yes |
| U |
N |
L |
3 |
4 |
-3.68 |
-2.46 |
90.81 |
-62.65 |
959.95 |
0.03 |
-0.03 |
NS |
1.00 |
Yes |
| U |
N |
L |
4 |
26 |
-8.78 |
-4.57 |
22.33 |
-33.14 |
67.33 |
0.20 |
-0.20 |
NS |
1.00 |
Yes |
| U |
S |
L |
3 |
3 |
1.06 |
1.06 |
165.02 |
-95.88 |
2,380.82 |
0.01 |
0.01 |
NS |
1.00 |
Yes |
| U |
S |
L |
4 |
35 |
-32.67 |
-10.49 |
6.31 |
-19.91 |
6.21 |
1.66 |
-1.35 |
NS |
1.00 |
Yes |
| U |
S |
LR |
3 |
2 |
-25.28 |
-16.86 |
96.24 |
-65.54 |
2,131.34 |
0.18 |
-0.15 |
NS |
0.89 |
Yes |
| U |
S |
LR |
4 |
8 |
-49.63 |
-12.81 |
4.96 |
-19.65 |
1.64 |
2.58 |
-1.80 |
NS |
0.65 |
Yes |
| U |
S |
R |
3 |
1 |
-73.45 |
-36.72 |
33.85 |
-49.91 |
1,914.45 |
1.09 |
-0.52 |
n/a |
|
n/a |
| U |
S |
R |
4 |
14 |
40.32 |
20.16 |
30.02 |
-19.67 |
112.29 |
0.67 |
0.79 |
NS |
0.59 |
Yes |
| U |
S |
XL |
3 |
1 |
99.71 |
99.71 |
528.39 |
-98.88 |
35,587.40 |
0.19 |
0.26 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
3 |
34.97 |
20.98 |
109.53 |
-54.29 |
1,087.46 |
0.19 |
0.22 |
NS |
0.79 |
Yes |
| U |
U |
L |
3 |
10 |
3.97 |
3.97 |
92.99 |
-81.99 |
500.14 |
0.04 |
0.04 |
NS |
1.00 |
Yes |
| U |
U |
L |
4 |
8 |
-81.50 |
-40.75 |
5.62 |
-47.19 |
-19.58 |
7.25 |
-2.78 |
SIG |
0.95 |
Yes |
| U |
U |
LR |
4 |
1 |
-47.51 |
-23.75 |
69.44 |
-49.85 |
4,639.94 |
0.34 |
-0.24 |
n/a |
|
n/a |
| U |
U |
R |
4 |
1 |
-7.93 |
-7.93 |
260.41 |
-99.64 |
23,435.42 |
0.03 |
-0.03 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-5. Yoked Comparison Evaluation Results
for Total Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
4 |
-67.45 |
-67.45 |
9.33 |
-44.71 |
0.07 |
3.61 |
-1.96 |
SIG |
0.65 |
Yes |
| R |
N |
LR |
4 |
2 |
-11.77 |
-5.88 |
47.18 |
-44.58 |
308.79 |
0.12 |
-0.12 |
NS |
0.78 |
Yes |
| R |
N |
R |
4 |
2 |
-7.11 |
-7.11 |
23.17 |
-32.53 |
73.49 |
0.15 |
-0.15 |
NS |
0.49 |
Yes |
| R |
S |
XL |
3 |
2 |
61.29 |
61.29 |
189.96 |
-83.96 |
1,522.35 |
0.32 |
0.41 |
NS |
0.62 |
Yes |
| R |
S |
XL |
4 |
4 |
-50.86 |
-50.86 |
26.61 |
-83.00 |
42.03 |
1.91 |
-1.31 |
NS |
0.69 |
Yes |
| R |
S |
XLR |
4 |
2 |
-39.42 |
-19.71 |
7.49 |
-14.31 |
26.55 |
0.88 |
-0.68 |
NS |
0.41 |
Yes |
| R |
U |
L |
3 |
34 |
-47.46 |
-47.46 |
16.56 |
-71.67 |
-2.55 |
2.87 |
-2.04 |
SIG |
0.61 |
Yes |
| R |
U |
L |
4 |
40 |
-47.32 |
-47.32 |
6.35 |
-35.29 |
-9.58 |
3.97 |
-2.84 |
SIG |
0.70 |
Yes |
| R |
U |
LR |
3 |
23 |
-51.34 |
-25.67 |
18.04 |
-63.87 |
17.14 |
2.26 |
-1.54 |
NS |
0.99 |
Yes |
| R |
U |
LR |
4 |
27 |
5.26 |
2.63 |
14.21 |
-19.00 |
39.36 |
0.19 |
0.19 |
NS |
0.99 |
Yes |
| R |
U |
R |
3 |
11 |
79.25 |
79.25 |
107.95 |
-44.94 |
483.59 |
0.73 |
0.97 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
43 |
-18.72 |
-18.72 |
11.48 |
-28.98 |
17.69 |
0.96 |
-0.86 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
1 |
0.00 |
0.00 |
193.65 |
-97.75 |
4,350.15 |
0.00 |
0.00 |
n/a |
|
n/a |
| U |
N |
L |
3 |
6 |
-25.86 |
-25.86 |
19.80 |
-41.41 |
46.43 |
0.78 |
-0.67 |
NS |
0.24 |
Yes |
| U |
N |
L |
4 |
47 |
-55.50 |
-55.50 |
3.36 |
-34.08 |
-20.70 |
8.43 |
-5.47 |
SIG |
0.32 |
Yes |
| U |
S |
L |
3 |
3 |
70.74 |
70.74 |
121.99 |
-57.92 |
592.68 |
0.58 |
0.75 |
NS |
0.98 |
Yes |
| U |
S |
L |
4 |
106 |
-42.02 |
-42.02 |
1.19 |
-13.98 |
-9.32 |
9.97 |
-7.50 |
SIG |
0.00 |
No |
| U |
S |
LR |
3 |
3 |
-8.02 |
-4.01 |
31.23 |
-41.79 |
107.29 |
-0.15 |
0.15 |
NS |
0.46 |
Yes |
| U |
S |
LR |
4 |
32 |
-30.94 |
-15.47 |
1.56 |
-8.74 |
-2.55 |
3.84 |
-3.17 |
SIG |
0.65 |
Yes |
| U |
S |
R |
3 |
2 |
-62.59 |
-62.59 |
15.45 |
-46.30 |
44.46 |
2.02 |
-1.19 |
NS |
0.04 |
No |
| U |
S |
R |
4 |
28 |
-25.74 |
-25.74 |
3.86 |
-16.67 |
-1.36 |
2.59 |
-2.23 |
SIG |
0.04 |
No |
| U |
S |
XL |
3 |
1 |
33.33 |
33.33 |
238.82 |
-96.02 |
4,362.97 |
0.14 |
0.16 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
4 |
-4.97 |
-4.97 |
15.07 |
-25.62 |
36.40 |
0.19 |
-0.18 |
NS |
0.08 |
Yes |
| U |
U |
L |
3 |
10 |
-55.44 |
-55.44 |
17.53 |
-79.39 |
-3.65 |
3.16 |
-2.05 |
SIG |
0.61 |
Yes |
| U |
U |
L |
4 |
16 |
-69.37 |
-69.37 |
3.26 |
-39.91 |
-26.76 |
10.64 |
-5.56 |
SIG |
0.59 |
Yes |
| U |
U |
LR |
4 |
2 |
53.64 |
26.82 |
80.23 |
-40.08 |
545.03 |
0.33 |
0.41 |
NS |
0.18 |
Yes |
| U |
U |
R |
4 |
1 |
-69.49 |
-69.49 |
71.55 |
-99.69 |
2,924.77 |
0.97 |
-0.51 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-6. Yoked Comparison Evaluation Results
for Fatal and Injury Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
4 |
-78.75 |
-78.75 |
8.67 |
-47.85 |
2.62 |
4.54 |
-1.90 |
NS |
0.65 |
Yes |
| R |
N |
LR |
4 |
2 |
-24.25 |
-12.12 |
44.62 |
-46.24 |
331.17 |
0.27 |
-0.24 |
NS |
0.50 |
Yes |
| R |
N |
R |
4 |
2 |
32.74 |
32.74 |
48.91 |
-34.35 |
231.36 |
0.33 |
0.38 |
NS |
0.80 |
Yes |
| R |
S |
XL |
3 |
2 |
64.93 |
64.93 |
203.08 |
-85.24 |
1,742.63 |
0.32 |
0.41 |
NS |
0.86 |
Yes |
| R |
S |
XL |
4 |
4 |
21.37 |
21.37 |
78.62 |
-65.90 |
332.02 |
0.27 |
0.30 |
NS |
1.00 |
Yes |
| R |
S |
XLR |
4 |
2 |
21.91 |
10.96 |
24.06 |
-14.67 |
190.29 |
0.15 |
0.17 |
NS |
0.51 |
Yes |
| R |
U |
L |
3 |
34 |
-40.80 |
-40.80 |
22.53 |
-71.92 |
24.82 |
1.81 |
-1.38 |
NS |
0.99 |
Yes |
| R |
U |
L |
4 |
41 |
-54.97 |
-54.97 |
6.89 |
-39.60 |
-11.12 |
4.25 |
-2.77 |
SIG |
1.00 |
Yes |
| R |
U |
LR |
3 |
24 |
-28.23 |
-14.11 |
28.77 |
-58.50 |
73.32 |
0.78 |
-0.66 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
29 |
-6.43 |
-3.22 |
15.69 |
-25.76 |
40.29 |
0.20 |
-0.20 |
NS |
1.00 |
Yes |
| R |
U |
R |
3 |
11 |
26.71 |
26.71 |
86.25 |
-66.62 |
381.08 |
0.31 |
0.35 |
NS |
0.99 |
Yes |
| R |
U |
R |
4 |
43 |
-10.90 |
-10.90 |
15.76 |
-29.77 |
35.65 |
0.41 |
-0.38 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
121.96 |
121.96 |
319.21 |
-86.75 |
3,619.01 |
0.38 |
0.55 |
NS |
0.30 |
Yes |
| U |
N |
L |
3 |
6 |
-38.23 |
-38.23 |
24.38 |
-49.79 |
74.56 |
0.94 |
-0.73 |
NS |
0.80 |
Yes |
| U |
N |
L |
4 |
49 |
-58.14 |
-58.14 |
4.99 |
-37.53 |
-17.26 |
5.94 |
-3.73 |
SIG |
1.00 |
Yes |
| U |
S |
L |
3 |
3 |
210.12 |
210.12 |
284.05 |
-48.49 |
1,767.16 |
0.74 |
1.24 |
NS |
0.94 |
Yes |
| U |
S |
L |
4 |
114 |
-39.99 |
-39.99 |
1.93 |
-14.58 |
-6.97 |
5.81 |
-4.46 |
SIG |
0.81 |
Yes |
| U |
S |
LR |
3 |
4 |
55.16 |
27.58 |
74.90 |
-41.65 |
360.97 |
0.49 |
0.61 |
NS |
0.88 |
Yes |
| U |
S |
LR |
4 |
34 |
-34.35 |
-17.17 |
2.62 |
-10.95 |
-0.39 |
2.56 |
-2.06 |
SIG |
0.92 |
Yes |
| U |
S |
R |
3 |
2 |
-86.69 |
-86.69 |
9.25 |
-49.56 |
51.49 |
4.69 |
-1.45 |
NS |
0.78 |
Yes |
| U |
S |
R |
4 |
30 |
-29.85 |
-29.85 |
6.36 |
-21.30 |
4.57 |
1.78 |
-1.48 |
NS |
0.98 |
Yes |
| U |
S |
XL |
3 |
1 |
-28.57 |
-28.57 |
148.85 |
-98.80 |
4,143.93 |
0.19 |
-0.16 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
4 |
-53.37 |
-53.37 |
14.86 |
-48.21 |
22.37 |
2.05 |
-1.37 |
NS |
0.30 |
Yes |
| U |
U |
L |
3 |
10 |
-52.96 |
-52.96 |
26.42 |
-84.35 |
41.44 |
2.00 |
-1.34 |
NS |
0.84 |
Yes |
| U |
U |
L |
4 |
16 |
-77.79 |
-77.79 |
3.70 |
-44.22 |
-28.66 |
10.51 |
-4.52 |
SIG |
0.90 |
Yes |
| U |
U |
LR |
4 |
2 |
-62.87 |
-31.43 |
29.45 |
-49.17 |
365.89 |
1.07 |
-0.62 |
NS |
0.58 |
Yes |
| U |
U |
R |
4 |
1 |
-38.98 |
-38.98 |
149.46 |
-99.50 |
7,321.45 |
0.26 |
-0.20 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-7. Yoked Comparison Evaluation Results
for Project-Related Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
4 |
-29.35 |
-29.35 |
40.58 |
-46.28 |
285.61 |
0.36 |
-0.30 |
NS |
0.85 |
Yes |
| R |
N |
LR |
4 |
2 |
-28.14 |
-14.07 |
69.42 |
-49.19 |
1,535.50 |
0.20 |
-0.17 |
NS |
0.87 |
Yes |
| R |
N |
R |
4 |
2 |
0.01 |
0.01 |
100.01 |
-49.01 |
2,470.19 |
0.00 |
0.00 |
NS |
1.00 |
Yes |
| R |
S |
XL |
3 |
2 |
-12.07 |
-12.07 |
175.87 |
-98.26 |
4,331.89 |
0.07 |
-0.06 |
NS |
0.96 |
Yes |
| R |
S |
XL |
4 |
4 |
15.21 |
15.21 |
111.82 |
-82.81 |
672.11 |
0.14 |
0.15 |
NS |
0.98 |
Yes |
| R |
S |
XLR |
4 |
2 |
14.57 |
7.29 |
32.12 |
-15.96 |
499.57 |
0.08 |
0.08 |
NS |
0.67 |
Yes |
| R |
U |
L |
3 |
34 |
2.03 |
2.03 |
49.49 |
-60.57 |
164.00 |
0.04 |
0.04 |
NS |
1.00 |
Yes |
| R |
U |
L |
4 |
41 |
-25.66 |
-25.66 |
15.50 |
-34.87 |
32.03 |
0.88 |
-0.76 |
NS |
1.00 |
Yes |
| R |
U |
LR |
3 |
24 |
-10.95 |
-5.48 |
40.46 |
-56.60 |
136.84 |
0.22 |
-0.20 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
30 |
19.17 |
9.58 |
26.34 |
-24.94 |
91.70 |
0.36 |
0.40 |
NS |
1.00 |
Yes |
| R |
U |
R |
3 |
11 |
5.84 |
5.84 |
90.26 |
-80.11 |
463.06 |
0.06 |
0.07 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
43 |
-9.68 |
9.68 |
21.27 |
-34.60 |
57.55 |
0.27 |
-0.25 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
30.05 |
30.05 |
209.71 |
-94.48 |
2,966.70 |
0.14 |
0.16 |
NS |
0.57 |
Yes |
| U |
N |
L |
3 |
6 |
-21.71 |
-21.71 |
51.73 |
-54.57 |
346.63 |
0.25 |
-0.22 |
NS |
1.00 |
Yes |
| U |
N |
L |
4 |
50 |
-8.21 |
-8.21 |
15.32 |
-26.36 |
37.90 |
0.27 |
-0.26 |
NS |
1.00 |
Yes |
| U |
S |
L |
3 |
3 |
-0.44 |
-0.44 |
162.58 |
-95.94 |
2,344.12 |
0.00 |
-0.00 |
NS |
0.99 |
Yes |
| U |
S |
L |
4 |
115 |
-33.88 |
33.88 |
2.87 |
-14.34 |
2.90 |
3.30 |
-2.66 |
SIG |
1.00 |
Yes |
| U |
S |
LR |
3 |
5 |
95.11 |
47.55 |
140.81 |
-49.82 |
1,109.84 |
0.42 |
0.58 |
NS |
0.99 |
Yes |
| U |
S |
LR |
4 |
32 |
-59.67 |
-29.83 |
1.77 |
-14.68 |
7.51 |
6.69 |
-4.10 |
SIG |
0.79 |
Yes |
| U |
S |
R |
3 |
2 |
-41.79 |
-41.79 |
47.53 |
-48.81 |
664.46 |
0.44 |
-0.33 |
NS |
0.88 |
Yes |
| U |
S |
R |
4 |
34 |
66.04 |
66.04 |
15.90 |
1.30 |
66.00 |
1.64 |
2.09 |
SIG |
0.01 |
No |
| U |
S |
XL |
3 |
1 |
0.00 |
0.00 |
282.84 |
-99.61 |
25,462.64 |
0.00 |
0.00 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
5 |
108.84 |
108.84 |
113.24 |
-38.42 |
730.24 |
0.53 |
0.75 |
NS |
0.71 |
Yes |
| U |
U |
L |
3 |
10 |
14.06 |
14.06 |
101.30 |
-79.99 |
550.30 |
0.14 |
0.15 |
NS |
1.00 |
Yes |
| U |
U |
L |
4 |
16 |
-78.11 |
-78.11 |
5.15 |
-45.65 |
22.50 |
7.59 |
-3.23 |
SIG |
0.97 |
Yes |
| U |
U |
LR |
4 |
2 |
141.99 |
70.99 |
169.28 |
-42.21 |
1,828.13 |
0.42 |
0.63 |
NS |
0.65 |
Yes |
| U |
U |
R |
4 |
1 |
-38.98 |
-38.98 |
172.58 |
-99.76 |
15,497.21 |
0.23 |
-0.17 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-8. Yoked Comparison Evaluation Results
for Project-Related Fatal and Injury Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
4 |
-15.07 |
-15.07 |
52.96 |
-46.32 |
439.40 |
0.14 |
-0.13 |
NS |
1.00 |
Yes |
| R |
N |
LR |
4 |
2 |
-28.14 |
-14.07 |
69.42 |
-49.19 |
1,535.50 |
0.20 |
-0.17 |
NS |
0.87 |
Yes |
| R |
N |
R |
4 |
2 |
0.01 |
0.01 |
100.01 |
-49.01 |
2,470.19 |
0.00 |
0.00 |
NS |
1.00 |
Yes |
| R |
S |
XL |
3 |
2 |
-12.07 |
-12.07 |
175.87 |
-98.26 |
4,331.89 |
0.07 |
-0.06 |
NS |
0.96 |
Yes |
| R |
S |
XL |
4 |
4 |
163.58 |
163.58 |
295.30 |
-70.67 |
2,268.98 |
0.55 |
0.87 |
NS |
0.86 |
Yes |
| R |
S |
XLR |
4 |
2 |
29.41 |
14.70 |
37.44 |
-15.95 |
631.00 |
0.13 |
0.15 |
NS |
0.90 |
Yes |
| R |
U |
L |
3 |
34 |
2.03 |
2.03 |
49.49 |
-60.57 |
164.00 |
0.04 |
0.04 |
NS |
1.00 |
Yes |
| R |
U |
L |
4 |
41 |
-23.73 |
-23.73 |
16.79 |
-35.19 |
38.08 |
0.75 |
-0.66 |
NS |
1.00 |
Yes |
| R |
U |
LR |
3 |
24 |
-11.66 |
-5.83 |
40.56 |
-57.05 |
137.67 |
0.23 |
-0.22 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
30 |
-2.49 |
-1.25 |
23.43 |
-30.99 |
75.04 |
0.05 |
-0.05 |
NS |
1.00 |
Yes |
| R |
U |
R |
3 |
11 |
5.84 |
5.84 |
90.26 |
-80.11 |
463.06 |
0.06 |
0.07 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
43 |
-5.70 |
-5.70 |
23.30 |
-34.49 |
67.48 |
0.14 |
-0.14 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
110.86 |
110.86 |
390.43 |
-94.40 |
7,845.84 |
0.28 |
0.40 |
NS |
0.73 |
Yes |
| U |
N |
L |
3 |
6 |
2.78 |
2.78 |
71.21 |
-53.59 |
532.89 |
0.02 |
0.02 |
NS |
1.00 |
Yes |
| U |
N |
L |
4 |
50 |
-16.09 |
-16.09 |
15.63 |
-30.09 |
36.55 |
0.53 |
-0.48 |
NS |
1.00 |
Yes |
| U |
S |
L |
3 |
3 |
-0.44 |
-0.44 |
162.58 |
-95.94 |
2,344.12 |
0.00 |
0.00 |
NS |
0.99 |
Yes |
| U |
S |
L |
4 |
116 |
-2.23 |
-2.23 |
5.62 |
-9.66 |
13.00 |
0.11 |
-0.11 |
NS |
1.00 |
Yes |
| U |
S |
LR |
3 |
5 |
-3.01 |
-1.51 |
75.60 |
-57.24 |
636.13 |
0.02 |
-0.02 |
NS |
1.00 |
Yes |
| U |
S |
LR |
4 |
33 |
-50.96 |
-25.48 |
3.37 |
-14.93 |
0.69 |
3.01 |
-2.06 |
SIG |
1.00 |
Yes |
| U |
S |
R |
3 |
2 |
-10.24 |
-10.24 |
89.76 |
-49.11 |
2,211.92 |
0.06 |
-0.05 |
NS |
0.97 |
Yes |
| U |
S |
R |
4 |
35 |
62.30 |
62.30 |
21.67 |
-6.69 |
84.83 |
1.12 |
1.41 |
NS |
0.96 |
Yes |
| U |
S |
XL |
3 |
1 |
0.00 |
0.00 |
282.84 |
-99.61 |
25,462.64 |
0.00 |
0.00 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
5 |
29.49 |
29.49 |
80.25 |
-47.48 |
584.96 |
0.20 |
0.23 |
NS |
0.99 |
Yes |
| U |
U |
L |
3 |
10 |
5.30 |
5.30 |
94.18 |
-81.76 |
507.82 |
0.06 |
0.06 |
NS |
1.00 |
Yes |
| U |
U |
L |
4 |
16 |
-68.60 |
-68.60 |
8.60 |
-44.63 |
4.08 |
3.99 |
-2.12 |
SIG |
1.00 |
Yes |
| U |
U |
LR |
4 |
2 |
-27.38 |
-13.69 |
70.16 |
-49.18 |
1,552.27 |
0.20 |
-0.17 |
NS |
0.86 |
Yes |
| U |
U |
R |
4 |
1 |
-38.98 |
-38.98 |
172.58 |
-99.76 |
15,497.21 |
0.23 |
-0.17 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-9. Yoked Comparison Evaluation for Project-Related
Intersection AccidentsAuto Matched.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
ss
| R |
N |
L |
4 |
2 |
109.08 |
54.54 |
104.11 |
-35.16 |
686.24 |
0.52 |
0.74 |
NS |
0.99 |
Yes |
| R |
N |
LR |
4 |
1 |
283.33 |
141.67 |
393.27 |
-46.56 |
10,643.71 |
0.36 |
0.65 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
-38.64 |
-19.32 |
61.82 |
-49.41 |
1,542.16 |
0.31 |
-0.24 |
n/a |
|
n/a |
| R |
S |
XL |
3 |
2 |
350.52 |
350.52 |
705.43 |
-79.07 |
9,595.30 |
0.50 |
0.96 |
NS |
0.94 |
Yes |
| R |
S |
XL |
4 |
4 |
7.61 |
7.61 |
82.50 |
-76.06 |
383.60 |
0.09 |
0.10 |
NS |
0.91 |
Yes |
| R |
S |
XLR |
4 |
1 |
-9.38 |
-2.34 |
36.95 |
-24.07 |
528.79 |
0.06 |
-0.06 |
n/a |
|
n/a |
| R |
U |
L |
3 |
34 |
123.68 |
123.68 |
83.83 |
7.30 |
366.29 |
1.48 |
2.15 |
SIG |
1.00 |
Yes |
| R |
U |
L |
4 |
22 |
3.70 |
2.09 |
20.20 |
-26.68 |
58.70 |
0.10 |
0.11 |
NS |
0.90 |
Yes |
| R |
U |
LR |
3 |
12 |
120.86 |
96.69 |
118.15 |
-32.36 |
575.28 |
0.82 |
1.18 |
NS |
0.98 |
Yes |
| R |
U |
LR |
4 |
15 |
66.35 |
33.17 |
30.01 |
-9.00 |
118.72 |
1.11 |
1.41 |
NS |
1.00 |
Yes |
| R |
U |
R |
3 |
11 |
7.02 |
7.02 |
75.92 |
-73.36 |
329.86 |
0.09 |
0.10 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
28 |
27.10 |
17.64 |
30.75 |
-25.16 |
106.30 |
0.57 |
0.65 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
89.07 |
89.07 |
190.91 |
-73.87 |
1,268.04 |
0.47 |
0.63 |
NS |
0.22 |
Yes |
| U |
N |
L |
3 |
4 |
33.86 |
22.57 |
89.80 |
-54.25 |
574.73 |
0.25 |
0.29 |
NS |
0.81 |
Yes |
| U |
N |
L |
4 |
24 |
92.22 |
48.12 |
23.77 |
10.85 |
107.42 |
2.02 |
2.76 |
SIG |
0.41 |
Yes |
| U |
S |
L |
3 |
3 |
72.16 |
72.16 |
220.51 |
-86.02 |
2,019.53 |
0.33 |
0.42 |
NS |
0.64 |
Yes |
| U |
S |
L |
4 |
37 |
-0.32 |
-0.10 |
3.88 |
-6.86 |
8.50 |
0.03 |
-0.03 |
NS |
0.05 |
Yes |
| U |
S |
LR |
3 |
2 |
21.81 |
14.54 |
107.34 |
-60.58 |
1,016.60 |
0.14 |
0.15 |
NS |
0.64 |
Yes |
| U |
S |
LR |
4 |
9 |
-44.51 |
-11.45 |
2.30 |
-15.31 |
6.15 |
4.98 |
-3.66 |
SIG |
0.28 |
Yes |
| U |
S |
R |
3 |
1 |
237.50 |
118.75 |
181.91 |
-29.60 |
1,345.85 |
0.65 |
1.13 |
n/a |
|
n/a |
| U |
S |
R |
4 |
12 |
2.36 |
1.23 |
8.42 |
-12.97 |
20.58 |
0.15 |
0.15 |
NS |
0.02 |
No |
| U |
S |
XL |
3 |
1 |
100.00 |
100.00 |
406.20 |
-96.27 |
10,611.75 |
0.25 |
0.34 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
3 |
-31.92 |
-19.15 |
21.37 |
-45.35 |
53.87 |
0.90 |
-0.73 |
NS |
0.78 |
Yes |
| U |
U |
L |
3 |
10 |
202.64 |
202.64 |
213.44 |
-24.04 |
1,105.75 |
0.95 |
1.57 |
NS |
0.90 |
Yes |
| U |
U |
L |
4 |
8 |
-38.17 |
-19.09 |
12.07 |
-35.62 |
16.45 |
1.58 |
-1.23 |
NS |
0.56 |
Yes |
| U |
U |
LR |
4 |
1 |
66.67 |
33.33 |
115.87 |
-44.54 |
1,221.71 |
0.29 |
0.37 |
n/a |
|
n/a |
| U |
U |
R |
4 |
1 |
500.00 |
500.00 |
1,509.97 |
-95.68 |
83,140.41 |
0.33 |
0.71 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-10. Yoked Comparison Evaluation Results
for Project-Related Fatal and Injury Intersection AccidentsAuto Matched.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
326.58 |
163.29 |
262.40 |
-30.87 |
2,327.76 |
0.62 |
1.18 |
NS |
0.39 |
Yes |
| R |
N |
LR |
4 |
1 |
225.00 |
112.50 |
338.02 |
-47.24 |
9,532.79 |
0.33 |
0.57 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
-11.76 |
-5.88 |
89.61 |
-49.18 |
2,313.44 |
0.07 |
-0.06 |
n/a |
|
n/a |
| R |
S |
XL |
3 |
2 |
311.85 |
311.85 |
700.77 |
-85.33 |
11,464.18 |
0.45 |
0.83 |
NS |
0.84 |
Yes |
| R |
S |
XL |
4 |
4 |
42.50 |
42.50 |
132.34 |
-76.91 |
779.64 |
0.32 |
0.38 |
NS |
0.94 |
Yes |
| R |
S |
XLR |
4 |
1 |
-35.00 |
-8.75 |
27.08 |
-24.38 |
400.92 |
0.32 |
-0.26 |
n/a |
|
n/a |
| R |
U |
L |
3 |
34 |
117.81 |
117.81 |
87.87 |
-1.22 |
380.28 |
1.34 |
1.93 |
NS |
1.00 |
Yes |
| R |
U |
L |
4 |
23 |
72.85 |
40.87 |
38.93 |
-11.95 |
156.90 |
1.05 |
1.36 |
NS |
0.98 |
Yes |
| R |
U |
LR |
3 |
12 |
86.17 |
68.94 |
103.92 |
-42.06 |
504.69 |
0.66 |
0.89 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
15 |
58.74 |
29.37 |
39.34 |
-19.96 |
159.68 |
0.75 |
0.93 |
NS |
1.00 |
Yes |
| R |
U |
R |
3 |
11 |
-0.17 |
-0.17 |
75.13 |
-77.17 |
336.41 |
0.00 |
0.00 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
28 |
34.30 |
22.34 |
38.64 |
-28.33 |
142.81 |
0.58 |
0.67 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
137.27 |
137.27 |
332.77 |
-84.81 |
3,607.34 |
0.41 |
0.62 |
NS |
0.89 |
Yes |
| U |
N |
L |
3 |
4 |
-15.45 |
-10.30 |
62.03 |
-60.14 |
420.50 |
0.17 |
-0.15 |
NS |
0.86 |
Yes |
| U |
N |
L |
4 |
25 |
107.23 |
55.85 |
34.87 |
5.22 |
151.21 |
1.60 |
2.26 |
SIG |
0.95 |
Yes |
| U |
S |
L |
3 |
3 |
2.14 |
2.14 |
143.17 |
-93.45 |
1,493.64 |
0.01 |
0.02 |
NS |
0.64 |
Yes |
| U |
S |
L |
4 |
36 |
15.98 |
5.09 |
7.60 |
-7.17 |
23.44 |
0.67 |
0.72 |
NS |
0.67 |
Yes |
| U |
S |
LR |
3 |
2 |
19.14 |
12.76 |
106.15 |
-60.88 |
1,023.81 |
0.12 |
0.13 |
NS |
0.55 |
Yes |
| U |
S |
LR |
4 |
9 |
-44.71 |
-11.50 |
4.42 |
-17.98 |
0.42 |
2.60 |
-1.91 |
NS |
0.40 |
Yes |
| U |
S |
R |
3 |
1 |
450.00 |
225.00 |
589.23 |
-45.87 |
18,280.96 |
0.38 |
0.80 |
n/a |
|
n/a |
| U |
S |
R |
4 |
14 |
8.34 |
4.17 |
12.30 |
-15.28 |
34.52 |
0.34 |
0.35 |
NS |
0.81 |
Yes |
| U |
S |
XL |
3 |
1 |
100.00 |
100.00 |
412.31 |
-96.48 |
11,272.58 |
0.24 |
0.34 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
3 |
60.80 |
36.48 |
77.90 |
-40.18 |
409.57 |
0.47 |
0.59 |
NS |
0.45 |
Yes |
| U |
U |
L |
3 |
10 |
149.46 |
149.46 |
185.68 |
-42.00 |
972.97 |
0.80 |
1.23 |
NS |
0.99 |
Yes |
| U |
U |
L |
4 |
8 |
-15.40 |
-7.70 |
21.44 |
-34.34 |
64.22 |
0.36 |
-0.33 |
NS |
0.92 |
Yes |
| U |
U |
LR |
4 |
1 |
300.00 |
150.00 |
458.26 |
-47.76 |
17,790.77 |
0.33 |
0.61 |
n/a |
|
n/a |
| U |
U |
R |
4 |
1 |
100.00 |
100.00 |
529.15 |
-98.88 |
35,638.72 |
0.19 |
0.26 |
n/a |
|
n/a |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
All of the unsignalized intersections evaluated in the study had two-way stop
control; i.e., there were stop signs on the minor-road approach(es) and no control
on the major road approaches. A newly signalized intersection is one that was
unsignalized before the improvement and signalized after the improvement; i.e.,
the intersection was signalized in conjunction with the turn lane improvement.
Project type: The third column identifies the type of improvement
project that was evaluated. the codes used in this column are:
L = Added left-turn lane(s)
LR = Added left- and right-turn lanes
R = Added right-turn lane(s)
XL = Extended the length of existing left-turn lane(s)
XLR = Extended the length of existing left- and right-turn lanes
Number of intersection legs: The fourth column identifies
the number of intersection legs for the intersections evaluated. Only three-
and four-leg intersections were considered in the evaluation.
Number of improved sites: The fifth column presents the number
of improved or treatment sites included in the evaluation in question. In tables
C-1 through C-4, C-9, and C-10, this represents the number of intersections
evaluated. In tables C-5 through C-8, this represents the number of intersection
approaches evaluated. The number of improved sites includes only those that
were actually evaluated. Some sites were excluded because they were found to
be outliers (see discussion in section 6 of this report). In the CG and
EB analyses, some sites were excluded because no satisfactory regression model
was available. For any given type of intersection and project type, the total
number of sites available before such exclusions can be determined from tables
in section 4 of this report.
Percent change in accident frequency: The sixth through tenth
columns present the mean percent change in accident frequency determined in
the YC analysis, the mean percent change in accident frequency per turn lane
installed, the standard error, and upper and lower confidence limits of the
mean change in accident frequency per turn lane installed. A negative value
of percent change in accident frequency represents a reduction in accidents,
while a positive value represents an increase in accidents. The values in these
five columns correspond to Emean for projects as a whole and Emean,
Emean(se), Emean(upper), and Emean(lower) per
turn lane added, as determined in Equations (12), (19), (20), and (21).
The value in the seventh column is the value in the sixth column divided by
the mean number of turn lanes added in the projects evaluated. For example,
the analysis in table C-1 addresses total intersection accidents. However,
in some projects, turn lanes were added on one approach; in some projects, turn
lanes were added on two approaches; and in some projects at signalized intersections,
left-turn lanes were added on all four approaches. The value in this seventh
column of the table expresses the effectiveness of the project on a per-added-lane
basis to facilitate comparisons across project types. It represents the best
overall measure of treatment effectiveness for the projects evaluated.
In results tables for analyses conducted for individual intersection approaches,
the project effectiveness estimate, Emean, and the effectiveness
estimate on a per-added-lane basis are usually the same because, in most cases,
only one turn lane was added to each approach. However, for projects involving
the addition of both left- and right-turn lanes, the two effectiveness measures
may differ.
The standard error and confidence limits presented in the eighth through tenth
columns of the table are measures of the precision of the mean accident frequency
per turn lane added presented in the seventh column. The confidence interval
for the analysis results, shown by the limits in the ninth and tenth columns
of the tables, is not symmetrical above and below the mean because, as shown
in section 5 of this report, the evaluation was performed on a logarithmic scale.
The standard error shown in the eighth column of the tables is the best single
estimate of the precision of the estimated mean project effectiveness per turn
lane installed.
Treatment effect: The eleventh through thirteenth columns
of the tables provide an assessment of the statistical significance of the treatment
effect determined above. The ratio in the eleventh column is the mean percent
change in accident frequency per turn lane installed divided by its standard
error. While this ratio was not used directly in the YC and CG approaches, a
similar ratio was used to determine statistical significance for the EB approach.
The twelfth and thirteen columns present the calculated Z-score for the treatment
effect and the significance of that Z-score at the 5 percent significance level
(i.e., the 95-percent confidence level). The codes for significance of the results
are:
SIG = Treatment effect is statistically significant
NS = Treatment effect is not statistically significant
n/a = Significance of treatment effect cannot be determined (typically because
only one site is available for evaluation)
Only those effectiveness measures found to be statistically significant should
be relied upon.
Test for homogeneity: The fourteenth and fifteenth columns
present the test for homogeneity discussed for the YC approach in section 5
of this report. The fourteenth column gives the value of PH determined
as shown in table 23. The fifteenth column shows whether the treatment group
is homogenous at the 5 percent significance level (i.e, 95-percent confidence
level). The homogeneity result was noted, but no results were excluded based
on this criterion.
Specific Evaluation Results
Table C-1 presents the results of the evaluation of treatment effectiveness
for accidents of all severity levels and for a target area including the entire
intersection (i.e., including all at-intersection and intersection-related accidents).
Analyses of this type are referred to in this report as addressing total
intersection accidents. Table C-2 presents comparable data to table C-1
for a dependent variable that includes only fatal and nonfatal injury accidents
(i.e., property-damage-only accidents were excluded). Analyses of this type
are referred to in this report as addressing fatal and injury intersection
accidents.
Table C-3 is analogous to table C-1 in that it addresses all accident severity
levels and includes the entire intersection as the target area, but it includes
only project-related accidents. Project-related accidents have been defined
in section 4 of this report as those accidents that involve a turning maneuver
that was related to the added or extended turn lane(s) being evaluated. Analyses
of this type are referred to in this report as addressing total project-related
intersection accidents. Table C-4 is similar to table C-3, but includes
only fatal and nonfatal injury accidents. Analyses of this type are referred
to in this report as addressing fatal and injury project-related intersection
accidents.
Tables C-5 through C-8 are analogous to tables C-1 through C-4 except that
they present results for evaluations in which each observation represents a
treated intersection approach rather than a treated intersection as a whole.
Only those approaches at the treated intersections on which a turn lane was
added or extended were included in the analyses. The comparison site for each
treated approach was comparable to the unimproved comparison site matched to
that particular treatment site. Table C-5 presents the results for total
accidents for individual intersection approaches. Table C-6 presents the
results for fatal and injury accidents for individual intersection approaches.
The results for project-related accidents for individual intersection approaches
are presented in table C-7 and the results for project-related fatal and
injury accidents for individual intersection approaches are presented in
table C-8.
The results of the auto-matching approach referred to above are presented
in table C-9 and C-10.
Comparison Group Evaluations
The results of the CG evaluation performed in this study are presented in
tables C-11 through C-16. These tables include results for three of the four
specific dependent variables that were included in the YC evaluation and for
the same two different target areas included in the YC evaluation. No CG analyses
were performed for project-related fatal and injury accidents because the available
sample size of such accidents was too small to develop satisfactory regression
relationships for use in the traffic volume adjustments.
Table C-11. Comparison Group Evaluation Results
for Total Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
-12.66 |
-6.33 |
9.22 |
-21.13 |
16.07 |
0.69 |
-0.64 |
NS |
0.55 |
Yes |
| R |
N |
LR |
4 |
1 |
-64.48 |
-32.24 |
9.19 |
-43.56 |
-1.05 |
3.51 |
-2.00 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
18.80 |
9.40 |
14.97 |
-13.76 |
47.35 |
0.63 |
0.68 |
n/a |
|
n/a |
| R |
U |
L |
3 |
35 |
-53.53 |
-53.53 |
5.63 |
-63.34 |
-41.08 |
9.52 |
-6.33 |
SIG |
0.35 |
Yes |
| R |
U |
L |
4 |
25 |
-60.61 |
33.67 |
2.54 |
-38.14 |
-28.07 |
13.23 |
-8.01 |
SIG |
0.00 |
No |
| R |
U |
LR |
3 |
12 |
-37.67 |
-30.13 |
12.57 |
-49.57 |
1.72 |
2.40 |
-1.88 |
NS |
0.20 |
Yes |
| R |
U |
LR |
4 |
15 |
-25.20 |
-12.60 |
5.28 |
-21.64 |
-0.68 |
2.39 |
-2.06 |
SIG |
0.31 |
Yes |
| R |
U |
R |
3 |
12 |
4.98 |
4.98 |
30.96 |
-41.11 |
87.14 |
0.16 |
0.16 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
29 |
-35.07 |
-22.60 |
5.16 |
-31.58 |
-11.17 |
4.38 |
-3.51 |
SIG |
0.86 |
Yes |
| R |
U |
XL |
4 |
2 |
-20.58 |
-20.58 |
27.89 |
-60.09 |
58.07 |
0.74 |
-0.66 |
NS |
0.19 |
Yes |
| U |
N |
L |
3 |
4 |
29.35 |
19.57 |
13.88 |
-3.77 |
51.55 |
1.41 |
1.60 |
NS |
0.01 |
No |
| U |
N |
L |
4 |
28 |
-46.43 |
-24.08 |
2.01 |
-27.75 |
-19.85 |
11.98 |
-8.63 |
SIG |
0.00 |
No |
| U |
S |
L |
3 |
3 |
21.24 |
21.24 |
50.03 |
-46.00 |
172.22 |
0.42 |
0.47 |
NS |
0.04 |
No |
| U |
S |
L |
4 |
37 |
-18.28 |
-5.78 |
1.05 |
-7.76 |
-3.64 |
5.50 |
-4.96 |
SIG |
0.00 |
No |
| U |
S |
LR |
3 |
2 |
5.44 |
3.63 |
15.27 |
-20.75 |
40.93 |
0.24 |
0.24 |
NS |
0.45 |
Yes |
| U |
S |
LR |
4 |
10 |
-26.59 |
-6.82 |
1.30 |
-9.20 |
-4.08 |
5.24 |
-4.47 |
SIG |
0.11 |
Yes |
| U |
S |
R |
3 |
1 |
-26.37 |
-13.19 |
15.84 |
-34.16 |
35.54 |
0.83 |
-0.71 |
n/a |
|
n/a |
| U |
S |
R |
4 |
17 |
8.82 |
-4.05 |
2.46 |
-8.61 |
1.07 |
1.64 |
-1.57 |
NS |
0.00 |
No |
| U |
S |
XL |
3 |
1 |
84.98 |
84.98 |
82.12 |
-22.51 |
341.59 |
1.03 |
1.39 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
3 |
42.34 |
25.40 |
11.20 |
6.04 |
50.44 |
2.27 |
2.69 |
SIG |
0.60 |
Yes |
| U |
U |
L |
3 |
10 |
-34.95 |
-34.95 |
13.11 |
-56.18 |
-3.43 |
2.67 |
-2.13 |
SIG |
0.12 |
Yes |
| U |
U |
L |
4 |
9 |
-53.42 |
-26.71 |
2.95 |
-31.83 |
-20.15 |
9.06 |
-6.04 |
SIG |
0.20 |
Yes |
| U |
U |
LR |
4 |
1 |
-59.39 |
-29.69 |
12.06 |
-43.66 |
15.03 |
2.46 |
-1.52 |
n/a |
|
n/a |
| U |
U |
R |
3 |
1 |
129.38 |
129.38 |
403.35 |
-92.69 |
7,100.71 |
0.32 |
0.47 |
n/a |
|
n/a |
| U |
U |
R |
4 |
3 |
-35.85 |
-21.51 |
23.30 |
-48.25 |
66.11 |
0.92 |
-0.73 |
NS |
0.46 |
Yes |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-12. Comparison Group Evaluation Results
for Fatal and Injury Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
-57.47 |
-28.74 |
6.30 |
-38.10 |
-12.01 |
4.56 |
-2.89 |
SIG |
0.48 |
Yes |
| R |
N |
LR |
4 |
1 |
-68.83 |
-34.42 |
9.97 |
-45.55 |
4.61 |
3.45 |
-1.82 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
-40.11 |
-20.05 |
10.97 |
-35.39 |
11.39 |
1.83 |
-1.40 |
n/a |
|
n/a |
| R |
U |
L |
3 |
35 |
-54.80 |
-54.80 |
8.30 |
-68.46 |
-35.23 |
6.60 |
-4.33 |
SIG |
0.81 |
Yes |
| R |
U |
L |
4 |
25 |
-73.90 |
-41.06 |
2.40 |
-45.08 |
-35.49 |
17.07 |
-8.10 |
SIG |
0.41 |
Yes |
| R |
U |
LR |
3 |
12 |
-32.38 |
-25.90 |
17.21 |
-51.00 |
20.92 |
1.51 |
-1.23 |
NS |
0.80 |
Yes |
| R |
U |
LR |
4 |
15 |
-44.67 |
-22.34 |
6.07 |
-32.01 |
-7.46 |
3.68 |
-2.70 |
SIG |
0.77 |
Yes |
| R |
U |
R |
3 |
12 |
5.33 |
5.33 |
40.07 |
-50.03 |
122.02 |
0.13 |
0.14 |
NS |
0.99 |
Yes |
| R |
U |
R |
4 |
29 |
-37.21 |
-23.98 |
6.59 |
-35.05 |
-8.76 |
3.64 |
-2.86 |
SIG |
0.97 |
Yes |
| R |
U |
XL |
4 |
2 |
24.09 |
24.09 |
64.90 |
-55.49 |
245.89 |
0.37 |
0.41 |
NS |
0.05 |
Yes |
| U |
N |
L |
3 |
4 |
32.94 |
21.96 |
24.56 |
-15.18 |
85.91 |
0.89 |
1.03 |
NS |
0.07 |
Yes |
| U |
N |
L |
4 |
28 |
-48.65 |
-25.23 |
3.12 |
-30.69 |
-18.35 |
8.08 |
-5.69 |
SIG |
0.00 |
No |
| U |
S |
L |
3 |
3 |
2.67 |
2.67 |
71.14 |
-73.60 |
299.23 |
0.04 |
0.04 |
NS |
0.31 |
Yes |
| U |
S |
L |
4 |
39 |
-17.95 |
-5.79 |
1.73 |
-8.97 |
-2.17 |
3.35 |
-3.03 |
SIG |
0.00 |
No |
| U |
S |
LR |
3 |
2 |
-0.94 |
-0.62 |
21.64 |
-31.92 |
58.84 |
0.03 |
-0.03 |
NS |
0.83 |
Yes |
| U |
S |
LR |
4 |
10 |
-45.93 |
-11.78 |
1.80 |
-14.89 |
-7.76 |
6.54 |
-4.73 |
SIG |
0.54 |
Yes |
| U |
S |
R |
3 |
1 |
-61.42 |
-30.71 |
17.17 |
-46.63 |
60.41 |
1.79 |
-1.07 |
n/a |
|
n/a |
| U |
S |
R |
4 |
17 |
-8.61 |
-3.85 |
3.89 |
-10.81 |
4.54 |
0.99 |
-0.95 |
NS |
0.01 |
No |
| U |
S |
XL |
3 |
1 |
80.37 |
80.37 |
120.37 |
-51.23 |
567.14 |
0.67 |
0.88 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
3 |
8.75 |
5.25 |
15.70 |
-19.29 |
44.56 |
0.33 |
0.35 |
NS |
0.36 |
Yes |
| U |
U |
L |
3 |
10 |
-31.93 |
-31.93 |
20.81 |
-62.62 |
23.95 |
1.53 |
-1.26 |
NS |
0.65 |
Yes |
| U |
U |
L |
4 |
9 |
-58.81 |
-29.40 |
4.04 |
-35.98 |
-19.74 |
7.28 |
-4.52 |
SIG |
0.39 |
Yes |
| U |
U |
LR |
4 |
1 |
-73.31 |
-36.66 |
15.56 |
-48.64 |
81.13 |
2.36 |
-1.13 |
n/a |
|
n/a |
| U |
U |
R |
3 |
1 |
135.84 |
135.84 |
425.90 |
-93.15 |
8,024.99 |
0.32 |
0.48 |
n/a |
|
n/a |
| U |
U |
R |
4 |
3 |
-1.49 |
-0.89 |
47.52 |
-47.77 |
225.77 |
0.02 |
-0.02 |
NS |
0.82 |
Yes |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident
frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
2 |
119.39 |
59.70 |
108.53 |
-34.22 |
712.68 |
0.55 |
0.79 |
NS |
0.95 |
Yes |
| R |
N |
LR |
4 |
1 |
105.35 |
52.67 |
206.39 |
-48.00 |
5,228.66 |
0.26 |
0.36 |
n/a |
|
n/a |
| R |
N |
R |
4 |
1 |
11.81 |
5.91 |
112.35 |
-48.91 |
2,821.20 |
0.05 |
0.06 |
n/a |
|
n/a |
| R |
U |
L |
3 |
35 |
-62.33 |
-62.33 |
14.53 |
-82.32 |
-19.76 |
4.29 |
-2.53 |
SIG |
1.00 |
Yes |
| R |
U |
L |
4 |
25 |
-38.23 |
-21.24 |
9.33 |
-35.41 |
2.90 |
2.28 |
-1.77 |
NS |
0.99 |
Yes |
| R |
U |
LR |
3 |
12 |
-50.64 |
-40.51 |
27.28 |
-69.80 |
72.91 |
1.49 |
-1.02 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
14 |
6.66 |
3.33 |
20.51 |
-24.90 |
63.32 |
0.16 |
0.17 |
NS |
0.94 |
Yes |
| R |
U |
R |
3 |
12 |
-46.82 |
-46.82 |
38.63 |
-87.19 |
120.84 |
1.21 |
-0.87 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
29 |
0.88 |
0.57 |
20.49 |
-29.39 |
56.15 |
0.03 |
0.03 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
2 |
-30.26 |
-30.26 |
66.53 |
-89.25 |
352.44 |
0.45 |
-0.38 |
NS |
0.39 |
Yes |
| R |
N |
L |
3 |
4 |
119.85 |
79.90 |
149.53 |
-46.82 |
1,015.85 |
0.53 |
0.77 |
NS |
0.99 |
Yes |
| U |
N |
L |
4 |
27 |
38.91 |
20.21 |
15.26 |
-4.27 |
57.26 |
1.32 |
1.55 |
NS |
0.49 |
Yes |
| U |
S |
L |
3 |
3 |
44.59 |
44.59 |
185.80 |
-88.35 |
1,694.62 |
0.24 |
0.29 |
NS |
0.82 |
Yes |
| U |
S |
L |
4 |
39 |
-7.22 |
-2.33 |
3.16 |
-7.92 |
4.56 |
0.74 |
|
NS |
0.20 |
Yes |
| U |
S |
LR |
3 |
2 |
249.52 |
166.35 |
356.90 |
-55.09 |
4,623.02 |
0.47 |
0.82 |
NS |
0.51 |
Yes |
| U |
S |
LR |
4 |
9 |
-40.18 |
-10.33 |
2.19 |
-14.07 |
-5.39 |
4.73 |
-3.62 |
SIG |
0.09 |
Yes |
| U |
S |
R |
3 |
1 |
-8.81 |
-4.40 |
55.35 |
-45.78 |
442.35 |
0.08 |
-0.08 |
n/a |
|
n/a |
| U |
S |
R |
4 |
17 |
5.88 |
2.78 |
8.38 |
-11.22 |
22.21 |
0.33 |
0.34 |
NS |
0.00 |
No |
| U |
S |
XL |
3 |
1 |
683.87 |
683.87 |
1,960.49 |
-94.17 |
105,378.46 |
0.35 |
0.82 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
3 |
25.14 |
15.08 |
38.48 |
-32.51 |
145.03 |
0.39 |
0.44 |
NS |
0.88 |
Yes |
| U |
U |
L |
3 |
10 |
59.28 |
59.28 |
113.90 |
-60.78 |
546.90 |
0.52 |
0.65 |
NS |
1.00 |
Yes |
| U |
U |
L |
4 |
9 |
-60.42 |
-30.21 |
7.58 |
-40.66 |
-8.07 |
3.99 |
-2.42 |
SIG |
0.78 |
Yes |
| U |
U |
LR |
4 |
1 |
-5.67 |
-2.83 |
61.43 |
-46.33 |
555.81 |
0.05 |
-0.04 |
n/a |
|
n/a |
| U |
U |
R |
3
|
1
|
48.58
|
48.58
|
401.88
|
-99.26
|
29,705.68
|
0.12
|
0.15
|
n/a |
|
n/a |
| U |
U |
R |
|
3
|
36.47
|
21.88
|
91.63
|
-50.87
|
674.17
|
0.24
|
0.28
|
NS |
0.81 |
Yes |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-14. Comparison Group Evaluation Results
for Total Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
4 |
-44.09 |
-44.09 |
7.26 |
-33.19 |
-3.51 |
3.04 |
-2.24 |
SIG |
0.60 |
Yes |
| R |
N |
LR |
4 |
2 |
-68.84 |
-34.42 |
8.75 |
-44.82 |
-3.15 |
3.93 |
-2.08 |
SIG |
0.90 |
Yes |
| R |
N |
R |
4 |
2 |
-29.49 |
-29.49 |
10.30 |
-30.11 |
12.49 |
1.43 |
-1.20 |
NS |
0.17 |
Yes |
| R |
U |
L |
3 |
70 |
-51.91 |
-51.91 |
7.31 |
-64.29 |
-35.23 |
7.10 |
-4.82 |
SIG |
0.99 |
Yes |
| R |
U |
L |
4 |
50 |
-61.03 |
-61.03 |
2.74 |
-38.66 |
-27.81 |
12.38 |
-7.45 |
SIG |
0.17 |
Yes |
| R |
U |
LR |
3 |
24 |
-29.08 |
-14.54 |
16.75 |
-48.20 |
21.21 |
1.39 |
-1.16 |
NS |
0.64 |
Yes |
| R |
U |
LR |
4 |
30 |
-27.90 |
-13.95 |
5.70 |
-23.55 |
-0.85 |
2.45 |
-2.07 |
SIG |
0.99 |
Yes |
| R |
U |
R |
3 |
24 |
5.74 |
5.74 |
37.73 |
-47.46 |
112.78 |
0.15 |
0.16 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
58 |
-31.55 |
-31.55 |
5.53 |
-29.95 |
-8.04 |
3.67 |
-3.02 |
SIG |
1.00 |
Yes |
| R |
U |
XL |
4 |
4 |
6.54 |
6.54 |
42.74 |
-51.47 |
133.90 |
0.15 |
0.16 |
NS |
0.65 |
Yes |
| U |
N |
L |
3 |
8 |
30.27 |
30.27 |
17.86 |
-8.64 |
63.30 |
1.13 |
1.29 |
NS |
0.22 |
Yes |
| U |
N |
L |
4 |
56 |
-45.73 |
-45.73 |
2.35 |
-27.96 |
-18.71 |
10.09 |
-7.32 |
SIG |
0.02 |
No |
| U |
S |
L |
3 |
9 |
34.12 |
34.12 |
58.51 |
-42.97 |
215.40 |
0.58 |
0.67 |
NS |
0.57 |
Yes |
| U |
S |
L |
4 |
147 |
-27.96 |
-27.96 |
1.03 |
-10.89 |
-6.85 |
8.70 |
-7.35 |
SIG |
0.00 |
No |
| U |
S |
LR |
3 |
6 |
-10.13 |
-5.06 |
14.65 |
-29.57 |
30.09 |
0.46 |
-0.44 |
NS |
0.62 |
Yes |
| U |
S |
LR |
4 |
39 |
-34.45 |
-17.23 |
1.24 |
-11.10 |
-6.23 |
7.14 |
-5.74 |
SIG |
0.90 |
Yes |
| U |
S |
R |
3 |
3 |
-23.41 |
-23.41 |
19.93 |
-36.19 |
56.22 |
0.59 |
-0.51 |
NS |
0.25 |
Yes |
| U |
S |
R |
4 |
66 |
-6.98 |
-6.98 |
2.59 |
-8.09 |
2.10 |
1.27 |
-1.22 |
NS |
0.01 |
No |
| U |
S |
XL |
3 |
1 |
-57.24 |
-57.24 |
66.62 |
-97.98 |
806.21 |
0.86 |
-0.55 |
n/a |
|
n/a |
| U |
S |
XL |
4 |
12 |
45.26 |
45.26 |
12.11 |
6.38 |
54.43 |
2.24 |
2.69 |
SIG |
0.08 |
Yes |
| U |
U |
L |
3 |
20 |
-49.26 |
-49.26 |
11.15 |
-67.02 |
-21.93 |
4.42 |
-3.09 |
SIG |
0.83 |
Yes |
| U |
U |
L |
4 |
18 |
-54.42 |
-54.42 |
3.11 |
-32.56 |
-20.21 |
8.74 |
-5.75 |
SIG |
0.39 |
Yes |
| U |
U |
LR |
4 |
2 |
-56.21 |
-28.11 |
15.45 |
-44.51 |
37.27 |
1.82 |
-1.17 |
NS |
0.21 |
Yes |
| U |
U |
R |
3 |
2 |
-2.67 |
-2.67 |
141.65 |
-94.39 |
1,587.02 |
0.02 |
-0.02 |
NS |
1.00 |
Yes |
| U |
U |
R |
4 |
6 |
-20.14 |
-20.14 |
27.03 |
-44.14 |
84.77 |
0.45 |
-0.40 |
NS |
0.90 |
Yes |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-15. Comparison Group Evaluation Results
for Fatal and Injury Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
4 |
-76.35 |
-76.35 |
4.15 |
-44.06 |
26.46 |
9.19 |
-4.11 |
SIG |
0.84 |
Yes |
| R |
N |
LR |
4 |
2 |
-69.73 |
-34.86 |
9.97 |
-45.84 |
5.02 |
3.50 |
-1.81 |
NS |
0.43 |
Yes |
| R |
N |
R |
4 |
2 |
-65.60 |
-65.60 |
7.55 |
-42.73 |
9.32 |
4.34 |
-2.43 |
SIG |
0.09 |
Yes |
| R |
U |
L |
3 |
70 |
-43.57 |
-43.57 |
10.90 |
-61.35 |
17.61 |
4.00 |
-2.96 |
SIG |
1.00 |
Yes |
| R |
U |
L |
4 |
50 |
-70.83 |
-70.83 |
2.73 |
-43.91 |
33.01 |
14.41 |
-7.31 |
SIG |
0.99 |
Yes |
| R |
U |
LR |
3 |
24 |
-15.48 |
-7.74 |
23.51 |
-45.79 |
53.66 |
0.53 |
-0.48 |
NS |
0.91 |
Yes |
| R |
U |
LR |
4 |
30 |
-35.96 |
-17.98 |
7.57 |
-29.86 |
0.90 |
2.37 |
-1.88 |
NS |
0.99 |
Yes |
| R |
U |
R |
3 |
24 |
-20.87 |
-20.87 |
30.78 |
-63.09 |
69.62 |
0.68 |
-0.60 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
58 |
-36.95 |
-36.95 |
6.33 |
-34.50 |
9.31 |
3.76 |
-2.96 |
SIG |
1.00 |
Yes |
| R |
U |
XL |
4 |
4 |
100.52 |
100.52 |
121.69 |
-38.96 |
558.79 |
0.83 |
1.15 |
NS |
0.75 |
Yes |
| U |
N |
L |
3 |
8 |
-11.37 |
-11.37 |
21.91 |
-38.10 |
55.55 |
0.35 |
-0.33 |
NS |
0.50 |
Yes |
| U |
N |
L |
4 |
55 |
-46.93 |
-46.93 |
3.67 |
-30.68 |
16.12 |
6.63 |
-4.75 |
SIG |
0.92 |
Yes |
| U |
S |
L |
3 |
9 |
18.52 |
18.52 |
73.44 |
-64.81 |
299.22 |
0.25 |
0.27 |
NS |
0.95 |
Yes |
| U |
S |
L |
4 |
154 |
-22.58 |
-22.58 |
1.71 |
-10.45 |
3.71 |
4.26 |
-3.74 |
SIG |
0.94 |
Yes |
| U |
S |
LR |
3 |
6 |
-5.03 |
-2.51 |
23.09 |
-35.68 |
62.72 |
0.15 |
-0.14 |
NS |
0.94 |
Yes |
| U |
S |
LR |
4 |
39 |
-49.70 |
-24.85 |
1.83 |
-15.88 |
-8.62 |
6.98 |
-4.85 |
SIG |
0.97 |
Yes |
| U |
S |
R |
3 |
3 |
-31.42 |
-31.42 |
30.06 |
-43.85 |
141.11 |
0.52 |
-0.43 |
NS |
0.68 |
Yes |
| U |
S |
R |
4 |
70 |
1.18 |
1.18 |
4.61 |
-7.68 |
10.52 |
0.12 |
0.12 |
NS |
0.28 |
Yes |
| U |
S |
XL |
3 |
2 |
5.75 |
5.75 |
124.45 |
-89.47 |
961.68 |
0.05 |
0.05 |
NS |
0.99 |
Yes |
| U |
S |
XL |
4 |
12 |
0.93 |
0.93 |
15.15 |
-22.91 |
38.89 |
0.04 |
0.04 |
NS |
0.99 |
Yes |
| U |
U |
L |
3 |
20 |
-37.99 |
-37.99 |
19.50 |
-66.53 |
14.86 |
1.95 |
-1.52 |
NS |
0.96 |
Yes |
| U |
U |
L |
4 |
18 |
-55.38 |
-55.38 |
4.78 |
-35.34 |
-16.06 |
5.80 |
-3.77 |
SIG |
0.72 |
Yes |
| U |
U |
LR |
4 |
2 |
-41.19 |
-20.60 |
31.78 |
-46.46 |
194.57 |
0.65 |
-0.49 |
NS |
0.41 |
Yes |
| U |
U |
R |
3 |
2 |
-19.16 |
-19.16 |
123.35 |
-95.94 |
1,508.78 |
0.16 |
-0.14 |
NS |
1.00 |
Yes |
| U |
U |
R |
4 |
6 |
46.78 |
46.78 |
60.66 |
-37.17 |
279.74 |
0.46 |
0.56 |
NS |
0.99 |
Yes |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-16. Comparison Group Evaluation Results
for Project-Related Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Treatment effect |
Test for homogeneity |
| Mean |
Mean per added lane |
Standard error |
Lower 95% confidence limit |
Upper 95% confidence limit |
Ratioa |
Calculated Z |
Significant at 5% level? |
Calculated H probability |
Homogeneous at 5% level? |
| R |
N |
L |
4 |
4 |
6.61 |
6.61 |
45.97 |
-40.17 |
238.93 |
0.07 |
0.07 |
NS |
0.96 |
Yes |
| R |
N |
LR |
4 |
2 |
83.23 |
41.61 |
130.98 |
-44.44 |
1,459.75 |
0.32 |
0.42 |
NS |
1.00 |
Yes |
| R |
N |
R |
4 |
2 |
-3.71 |
3.71 |
68.71 |
-47.06 |
739.57 |
0.03 |
-0.03 |
NS |
1.00 |
Yes |
| R |
U |
L |
3 |
70 |
-64.29 |
-64.29 |
10.51 |
-79.95 |
-36.41 |
6.11 |
-3.50 |
SIG |
1.00 |
Yes |
| R |
U |
L |
4 |
50 |
-23.25 |
-23.25 |
10.03 |
-28.67 |
12.07 |
1.29 |
-1.12 |
NS |
1.00 |
Yes |
| R |
U |
LR |
3 |
24 |
-50.45 |
-25.23 |
20.80 |
-65.83 |
30.86 |
1.94 |
-1.34 |
NS |
1.00 |
Yes |
| R |
U |
LR |
4 |
30 |
11.61 |
5.80 |
16.19 |
-18.40 |
48.55 |
0.36 |
0.38 |
NS |
1.00 |
Yes |
| R |
U |
R |
3 |
24 |
-47.37 |
-47.37 |
30.26 |
-82.94 |
62.40 |
1.57 |
-1.12 |
NS |
1.00 |
Yes |
| R |
U |
R |
4 |
58 |
20.39 |
20.39 |
19.36 |
-16.87 |
62.08 |
0.68 |
0.74 |
NS |
1.00 |
Yes |
| R |
U |
XL |
4 |
4 |
-25.90 |
-25.90 |
62.07 |
-85.65 |
282.72 |
0.42 |
-0.36 |
NS |
0.84 |
Yes |
| U |
N |
L |
3 |
8 |
84.44 |
84.44 |
94.58 |
-39.44 |
488.65 |
0.60 |
0.80 |
NS |
1.00 |
Yes |
| U |
N |
L |
4 |
56 |
44.56 |
44.56 |
14.47 |
-0.51 |
57.58 |
1.60 |
1.91 |
NS |
1.00 |
Yes |
| U |
S |
L |
3 |
9 |
-0.47 |
-0.47 |
80.28 |
-79.52 |
383.64 |
0.01 |
-0.01 |
NS |
1.00 |
Yes |
| U |
S |
L |
4 |
155 |
7.92 |
7.92 |
3.46 |
-3.60 |
10.04 |
0.74 |
0.77 |
NS |
1.00 |
Yes |
| U |
S |
LR |
3 |
6 |
132.10 |
66.05 |
147.45 |
-42.76 |
934.97 |
0.60 |
0.88 |
NS |
0.99 |
Yes |
| U |
S |
LR |
4 |
38 |
-39.11 |
-19.56 |
2.28 |
-13.92 |
-4.88 |
4.41 |
-3.41 |
SIG |
0.99 |
Yes |
| U |
S |
R |
3 |
3 |
-21.65 |
-21.65 |
44.34 |
-45.74 |
310.13 |
0.24 |
-0.22 |
NS |
1.00 |
Yes |
| U |
S |
R |
4 |
72 |
-73.15 |
-73.15 |
12.06 |
14.32 |
62.26 |
2.89 |
3.76 |
SIG |
0.44 |
Yes |
| U |
S |
XL |
3 |
3 |
156.21 |
156.21 |
385.19 |
-86.55 |
4,778.84 |
0.41 |
0.63 |
NS |
1.00 |
Yes |
| U |
S |
XL |
4 |
12 |
36.34 |
36.34 |
38.97 |
-27.85 |
148.12 |
0.56 |
0.65 |
NS |
0.99 |
Yes |
| U |
U |
L |
3 |
20 |
54.97 |
54.97 |
82.88 |
-45.67 |
342.06 |
0.66 |
0.82 |
NS |
1.00 |
Yes |
| U |
U |
L |
4 |
18 |
-60.46 |
-60.46 |
6.92 |
-40.04 |
-10.76 |
4.37 |
-2.65 |
SIG |
0.99 |
Yes |
| U |
U |
LR |
4 |
2 |
31.64 |
15.82 |
72.94 |
-42.50 |
527.63 |
0.22 |
0.25 |
NS |
0.77 |
Yes |
| U |
U |
R |
3 |
2 |
46.13 |
46.13 |
335.89 |
-98.39 |
13,121.00 |
0.14 |
0.17 |
NS |
1.00 |
Yes |
| U |
U |
R |
4 |
6 |
91.07 |
91.07 |
98.90 |
-38.87 |
561.85 |
0.55 |
0.75 |
NS |
1.00 |
Yes |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
The CG approach to before-after evaluation has been described conceptually
in section 5 of this report. The procedures presented in that section have
been used to derive the analysis results in tables C-11 through C-16. These
analyses involved the matching of individual treatment sites to an entire group
of similar unimproved comparison sites.
Description of Results Tables
The results tables for the CG approach are identical in format to the tables
for the YC approach.
Specific Evaluation Results
The results of the CG evaluation are presented in the following tables:
- Table C-11total intersection accidents.
- Table C-12fatal and injury intersection accidents.
- Table C-13project-related intersection accidents.
- Table C-14total accidents for individual intersection approaches.
- Table C-15fatal and injury accidents for individual intersection approaches.
- Table C-16project-related accidents for individual intersection approaches.
Empirical Bayes Evaluations
The results of the EB evaluation are presented in tables C-17 through C-22.
The tables include results for the same three dependent variables and the same
two target areas that were included in the CG evaluation. No EB analyses were
performed for project-related fatal and injury accidents because the available
sample size of such accidents was too small to develop satisfactory regression
relationships to represent expected accident frequencies in the EB analysis.
The EB approach to before-after evaluation has been described conceptually
in section 5 of this report. The procedures presented in that section have
been used to derive the analysis results in tables C-17 through C-22. These
analyses involved weighing of observed and expected accident frequencies to
obtain the best estimate of accident frequency for the before study period,
which is then compared to the observed accident frequency for the after period.
Table C-17. Empirical Bayes Evaluation Results
for Total Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Ratioa |
Significant? |
| Mean |
Mean per added lane |
Standard error |
| R |
N |
L |
4 |
2 |
6.59 |
3.30 |
9.79 |
0.3 |
NS |
| R |
N |
LR |
4 |
1 |
-55.96 |
-27.98 |
9.56 |
2.9 |
n/a |
| R |
N |
R |
4 |
1 |
46.76 |
23.38 |
16.22 |
1.4 |
n/a |
| R |
U |
L |
3 |
36 |
-43.67 |
-43.67 |
5.47 |
8.0 |
SIG |
| R |
U |
L |
4 |
25 |
-49.61 |
-27.56 |
2.63 |
10.5 |
SIG |
| R |
U |
LR |
3 |
12 |
-29.42 |
-23.54 |
10.96 |
2.1 |
SIG |
| R |
U |
LR |
4 |
15 |
2.06 |
1.03 |
5.35 |
0.2 |
NS |
| R |
U |
R |
3 |
11 |
20.54 |
20.54 |
26.28 |
0.8 |
NS |
| R |
U |
R |
4 |
28 |
-21.97 |
-13.98 |
5.17 |
2.7 |
SIG |
| R |
U |
XL |
4 |
2 |
-22.00 |
-22.00 |
22.51 |
1.0 |
NS |
| U |
N |
L |
3 |
3 |
46.57 |
27.94 |
13.78 |
2.0 |
SIG |
| U |
N |
L |
4 |
25 |
-19.96 |
-10.40 |
2.77 |
3.8 |
SIG |
| U |
S |
L |
4 |
39 |
-29.53 |
-9.52 |
0.83 |
11.4 |
SIG |
| U |
S |
LR |
4 |
10 |
-27.80 |
-7.13 |
1.21 |
5.9 |
SIG |
| U |
S |
R |
4 |
18 |
-9.01 |
-4.05 |
1.96 |
2.1 |
SIG |
| U |
S |
XL |
4 |
3 |
49.45 |
29.67 |
10.62 |
2.8 |
SIG |
| U |
U |
L |
3 |
8 |
-33.15 |
-33.15 |
12.11 |
2.7 |
SIG |
| U |
U |
L |
4 |
9 |
-0.33 |
-0.17 |
4.97 |
0.0 |
NS |
| U |
U |
LR |
4 |
1 |
-57.63 |
-28.82 |
11.01 |
2.6 |
n/a |
| U |
U |
R |
3 |
1 |
7.05 |
7.05 |
111.08 |
0.1 |
n/a |
| U |
U |
R |
4 |
3 |
-67.11 |
-40.26 |
10.08 |
4.0 |
SIG |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-18. Empirical Bayes Evaluation Results
for Fatal and Injury Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Ratioa |
Significant? |
| Mean |
Mean per added lane |
Standard error |
| R |
N |
L |
4 |
2 |
-18.46 |
-9.23 |
10.11 |
0.9 |
NS |
| R |
N |
LR |
4 |
1 |
-48.10 |
-24.05 |
13.71 |
1.8 |
n/a |
| R |
N |
R |
4 |
1 |
4.07 |
2.03 |
16.28 |
0.1 |
n/a |
| R |
U |
L |
4 |
24 |
-63.41 |
-35.39 |
3.01 |
11.8 |
SIG |
| R |
U |
LR |
4 |
15 |
-22.50 |
-11.25 |
6.25 |
1.8 |
NS |
| R |
U |
R |
4 |
28 |
-15.86 |
-10.33 |
7.93 |
1.3 |
NS |
| R |
U |
XL |
4 |
2 |
1.19 |
1.19 |
39.29 |
0.0 |
NS |
| U |
N |
L |
3 |
3 |
100.06 |
60.04 |
38.69 |
1.6 |
NS |
| U |
N |
L |
4 |
14 |
-54.19 |
-28.10 |
4.95 |
5.7 |
SIG |
| U |
S |
L |
4 |
39 |
-28.40 |
-9.15 |
1.31 |
7.0 |
SIG |
| U |
S |
LR |
4 |
10 |
-45.23 |
-11.60 |
1.68 |
6.9 |
SIG |
| U |
S |
R |
4 |
17 |
-20.55 |
-9.19 |
2.99 |
3.1 |
SIG |
| U |
S |
XL |
4 |
3 |
31.88 |
19.13 |
15.83 |
1.2 |
NS |
| U |
U |
L |
3 |
8 |
-23.54 |
-23.54 |
19.75 |
1.2 |
NS |
| U |
U |
L |
4 |
2 |
-7.87 |
-3.93 |
33.49 |
0.1 |
NS |
| U |
U |
R |
3 |
1 |
149.31 |
149.31 |
250.55 |
0.6 |
n/a |
| U |
U |
R |
4 |
2 |
-53.41 |
-35.61 |
31.50 |
1.1 |
NS |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-19. Empirical Bayes Evaluation Results
for Project-Related Intersection Accidents.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Ratioa |
Significant? |
| Mean |
Mean per added lane |
Standard error |
| R |
N |
L |
4 |
2 |
51.84 |
25.92 |
40.88 |
0.6 |
NS |
| R |
N |
LR |
4 |
1 |
-100.00 |
-50.00 |
|
|
n/a |
| R |
N |
R |
4 |
1 |
-100.00 |
-50.00 |
|
|
n/a |
| R |
U |
L |
4 |
23 |
-66.23 |
-37.16 |
7.42 |
5.0 |
SIG |
| R |
U |
LR |
4 |
14 |
53.05 |
26.52 |
22.68 |
1.2 |
NS |
| R |
U |
R |
4 |
29 |
33.90 |
21.85 |
26.57 |
0.8 |
NS |
| R |
U |
XL |
4 |
2 |
62.88 |
62.88 |
108.20 |
0.6 |
NS |
| U |
N |
L |
4 |
13 |
6.03 |
3.13 |
9.49 |
0.3 |
NS |
| U |
U |
L |
4 |
7 |
-51.15 |
-25.58 |
7.24 |
3.5 |
SIG |
| U |
U |
LR |
4 |
1 |
-45.44 |
-22.72 |
29.05 |
0.8 |
n/a |
| U |
U |
R |
4 |
1 |
-100.00 |
-50.00 |
|
|
n/a |
a Ratio of mean percent change in accident frequency to standard
deviation of percent change in accident frequency per turn lane installed.
Table C-20. Empirical Bayes Analysis Results
for Total Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Ratioa |
Significant? |
| Mean |
Mean per added lane |
Standard error |
| R |
N |
L |
4 |
4 |
-22.62 |
-22.62 |
7.26 |
1.6 |
NS |
| R |
N |
LR |
4 |
2 |
-61.41 |
-30.71 |
8.18 |
3.8 |
SIG |
| R |
N |
R |
4 |
2 |
6.00 |
6.00 |
11.64 |
0.3 |
NS |
| R |
U |
L |
3 |
62 |
-45.20 |
-45.20 |
6.50 |
7.0 |
SIG |
| R |
U |
L |
4 |
50 |
-54.63 |
-54.63 |
2.41 |
12.6 |
SIG |
| R |
U |
LR |
3 |
16 |
-30.38 |
-15.19 |
17.12 |
1.8 |
NS |
| R |
U |
LR |
4 |
30 |
-16.76 |
-8.38 |
4.39 |
1.9 |
NS |
| R |
U |
R |
3 |
18 |
104.41 |
104.41 |
61.09 |
1.7 |
NS |
| R |
U |
R |
4 |
57 |
-26.66 |
-26.66 |
5.26 |
3.3 |
SIG |
| R |
U |
XL |
4 |
4 |
-43.02 |
-43.02 |
17.03 |
2.5 |
SIG |
| U |
N |
L |
3 |
6 |
44.68 |
44.68 |
18.88 |
1.4 |
NS |
| U |
N |
L |
4 |
49 |
-28.02 |
-28.02 |
2.92 |
5.0 |
SIG |
| U |
S |
L |
3 |
9 |
-49.26 |
-49.26 |
13.87 |
3.6 |
SIG |
| U |
S |
L |
4 |
148 |
-34.15 |
-34.15 |
0.79 |
13.9 |
SIG |
| U |
S |
LR |
3 |
6 |
-19.32 |
-9.66 |
9.15 |
1.4 |
NS |
| U |
S |
LR |
4 |
38 |
-32.49 |
-16.24 |
1.14 |
7.3 |
SIG |
| U |
S |
R |
3 |
3 |
-44.48 |
-44.48 |
10.42 |
2.1 |
SIG |
| U |
S |
R |
4 |
67 |
-17.62 |
-17.62 |
1.96 |
4.2 |
SIG |
| U |
S |
XL |
3 |
2 |
7.17 |
7.17 |
40.41 |
0.2 |
NS |
| U |
S |
XL |
4 |
11 |
57.80 |
57.80 |
11.72 |
3.0 |
SIG |
| U |
U |
L |
3 |
16 |
-32.28 |
-32.28 |
13.14 |
2.5 |
SIG |
| U |
U |
L |
4 |
17 |
-20.13 |
-20.13 |
4.40 |
2.3 |
SIG |
| U |
U |
LR |
4 |
2 |
-66.27 |
-33.13 |
9.93 |
3.3 |
SIG |
| U |
U |
R |
3 |
2 |
-100.00 |
-100.00 |
|
|
NS |
| U |
U |
R |
4 |
6 |
-75.80 |
-75.80 |
8.48 |
5.4 |
SIG |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-21. Empirical Bayes Evaluation Results for Fatal and Injury
Accidents on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Ratioa |
Significant? |
| Mean |
Mean per added lane |
Standard error |
| R |
N |
L |
4 |
4 |
-42.11 |
-42.11 |
7.57 |
2.8 |
SIG |
| R |
N |
LR |
4 |
2 |
-55.36 |
-27.68 |
11.57 |
2.4 |
SIG |
| R |
N |
R |
4 |
2 |
-22.53 |
-22.53 |
12.25 |
0.9 |
NS |
| R |
U |
L |
4 |
49 |
-60.99 |
-60.99 |
3.15 |
10.8 |
SIG |
| R |
U |
LR |
4 |
30 |
-10.73 |
-5.37 |
7.33 |
0.7 |
NS |
| R |
U |
R |
4 |
55 |
-24.28 |
-24.28 |
7.94 |
2.0 |
SIG |
| R |
U |
XL |
4 |
4 |
-80.35 |
-80.35 |
70.18 |
1.1 |
NS |
| U |
N |
L |
4 |
48 |
-43.18 |
-43.18 |
3.99 |
5.6 |
SIG |
| U |
S |
L |
3 |
9 |
-47.59 |
-47.59 |
23.93 |
2.0 |
SIG |
| U |
S |
L |
4 |
122 |
-35.32 |
-35.32 |
1.25 |
8.9 |
SIG |
| U |
S |
LR |
3 |
5 |
-8.05 |
-4.03 |
19.49 |
0.3 |
NS |
| U |
S |
LR |
4 |
35 |
-53.41 |
-26.70 |
1.51 |
9.1 |
SIG |
| U |
S |
R |
3 |
3 |
-38.69 |
-38.69 |
22.06 |
0.9 |
NS |
| U |
S |
R |
4 |
64 |
-22.20 |
-22.20 |
3.07 |
3.4 |
SIG |
| U |
S |
XL |
3 |
2 |
-43.84 |
-43.84 |
56.78 |
0.8 |
NS |
| U |
S |
XL |
4 |
11 |
31.47 |
31.47 |
14.96 |
1.2 |
NS |
| U |
U |
L |
4 |
17 |
-5.21 |
-5.21 |
7.80 |
0.3 |
NS |
| U |
U |
LR |
4 |
2 |
-42.22 |
-21.11 |
29.10 |
0.7 |
NS |
| U |
U |
R |
4 |
6 |
-41.08 |
-41.08 |
25.25 |
1.0 |
NS |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Table C-22. Empirical Bayes Analysis Results for Project-Related Accidents
on Individual Intersection Approaches.
| Area type |
Traffic control |
Project type |
No. of legs |
No. of improved sites |
Percent change in accident frequency |
Ratioa |
Significant? |
| Mean |
Mean per added lane |
Standard error |
| R |
N |
L |
4 |
4 |
29.19 |
-29.19 |
32.30 |
0.5 |
NS |
| R |
N |
LR |
4 |
2 |
-100.00 |
-50.00 |
|
|
NS |
| R |
N |
R |
4 |
2 |
-100.00 |
-100.00 |
|
|
NS |
| R |
U |
L |
4 |
50 |
-22.11 |
-22.11 |
11.06 |
1.1 |
NS |
| R |
U |
LR |
4 |
30 |
97.51 |
48.76 |
24.04 |
2.0 |
SIG |
| R |
U |
R |
4 |
58 |
34.23 |
34.23 |
26.33 |
0.8 |
NS |
| R |
U |
XL |
4 |
4 |
50.96 |
50.96 |
97.67 |
0.5 |
NS |
| U |
N |
L |
4 |
26 |
6.24 |
6.24 |
9.10 |
0.4 |
NS |
| U |
S |
L |
4 |
127 |
-40.40 |
-40.40 |
1.82 |
6.9 |
SIG |
| U |
S |
LR |
4 |
34 |
-49.50 |
-24.75 |
1.80 |
7.1 |
SIG |
| U |
S |
R |
4 |
67 |
1.98 |
1.98 |
5.22 |
0.2 |
NS |
| U |
S |
XL |
4 |
12 |
108.85 |
108.85 |
50.09 |
1.3 |
NS |
| U |
U |
L |
4 |
14 |
-50.53 |
-50.53 |
7.24 |
3.5 |
SIG |
| U |
U |
LR |
4 |
2 |
-42.14 |
-21.07 |
30.13 |
0.7 |
NS |
| U |
U |
R |
4 |
2 |
-100.00 |
-100.00 |
|
|
NS |
a Ratio of mean percent change in accident frequency to standard
error of percent change in accident frequency per turn lane installed.
Description of Results Tables
The first seven columns of the results tables for the EB analysis are identical
to the first five columns of the results tables for the YC and CG analysis.
In particular, the sixth column presents the mean treatment effectiveness, q*
from Equation (44), expressed as a percentage change in accident frequency.
The seventh column presents the mean percentage change in accident frequency
per turn lane added, determined in the same manner that it was for the YC and
CG analyses.
The eighth column of the results tables for the EB analysis presents the standard
error of the mean treatment effectiveness per turn lane added. This standard
error is the square root of VAR{q*} from Equation (47), expressed as a
percentage change in accident frequency.
The ninth column is a ratio determined as the mean treatment effectiveness
(in the seventh column) divided by the standard error of treatment effectiveness
(in the eighth column).
The tenth column shows the significance of the mean treatment effectiveness.
The treatment effectiveness is considered to be significant if the ratio in
the ninth column is greater than or equal to 2.0. This significance criterion
is not a formal test of statistical significance at a specified confidence interval
but, rather, is a criterion recommended by Hauer(2) for judging the
results of EB analyses. This criterion is, however, equivalent to the statistical
significance criteria used for the YC and CG approaches.
Specific Evaluation Results
The results of the EB evaluation are presented in the following tables:
- Table C-17total intersection accidents.
- Table C-18fatal and injury intersection accidents.
- Table C-19project-related intersection accidents.
- Table C-20total accidents for individual intersection approaches.
- Table C-21fatal and injury accidents for individual intersection approaches.
- Table C-22project-related accidents for individual intersection approaches.
Previous | Table
of Contents | Next