Strategic Focus Areas |
FY03 |
FY04 |
FY05 |
FY06 |
FY07 |
FY08 |
FY09 |
|---|---|---|---|---|---|---|---|
Risk and Vulnerability Assessment |
|||||||
Synthesis of existing risk and vulnerability assessment methodologies |
|||||||
Determination of levels of risk and probability of occurrence for each event, and development of consistent risk assessment methodology |
|||||||
Development of criticality models for bridges and tunnels for incorporation into risk assessment models |
|||||||
Lessons learned - Bridge demolition |
From the last half of Fiscal Year 2005 to the first half of Fiscal Year 2006 | ||||||
Guide to risk management of multimodal transportation infrastructure (NCHRP) |
|||||||
System Analysis and Design |
|||||||
Standardized blast response curves for bridges (develop vulnerability curves to allow engineers to design appropriate standoff devices to mitigate these threats) (FHWA/U.S. Army COE) |
From the last half of Fiscal Year 2003 to the first half of Fiscal Year 2004 | ||||||
Table 2: Research studies, continued.
Strategic Focus Areas |
FY03 |
FY04 |
FY05 |
FY06 |
FY07 |
FY08 |
FY09 |
|---|---|---|---|---|---|---|---|
ConWep modifications for bridges (FHWA/U.S. Army COE) |
From the last half of Fiscal Year 2003 to the first half of Fiscal Year 2004 | ||||||
Validation of numerical modeling and analysis of steel bridge towers subjected to blast loadings (FHWA/U.S. Army COE) |
From the last quarter of Fiscal Year 2004 to Fiscal Year 2006 | ||||||
Assessment of bridge designs for structural vulnerability against terrorist events |
|||||||
Assessment of tunnel designs to resist blast and fire |
|||||||
Optimized designs for hazard loadings |
|||||||
Catalog of optimized design solutions for each event |
|||||||
Advanced physical and numerical modeling and simulation capabilities for predicting and understanding behavior under extreme events |
|||||||
Blast-resistant designs - Impact attenuators - Structural cladding |
|||||||
Structural vulnerability guide |
|||||||
Blast effects and retrofit techniques for tunnels |
|||||||
Making transportation tunnels safe and secure (NCHRP) |
From the last half of Fiscal Year 2004 to the first half of Fiscal Year 2005 | ||||||
Better protection of piers against impact and/or blast loadings |
|||||||
Blast testing of full-scale, precast, prestressed concrete girder bridges (WA State DOT) |
From the First three quarters of Fiscal Year 2005 to the first quarter of Fiscal Year 2007 | ||||||
Blast-resistant highway bridges: Design and detailing guidelines (NCHRP) |
From Fiscal Year 2005 to the first half of Fiscal Year 2008 | ||||||
Improved Materials |
|||||||
Response modification devices |
|||||||
Material performance under extreme event loadings |
|||||||
Resistant materials and coatings for improved performance |
|||||||
Shape-memory alloys for bridge structural applications |
|||||||
Nanoscale science and engineering |
|||||||
MEMS sensors research |
|||||||
Prevention, Detection, and Surveillance |
|||||||
Synthesis of bridge and tunnel surveillance and security technologies (FHWA) |
From the last half of Fiscal Year 2003 to the first half of Fiscal Year 2004 | ||||||
Hazard mitigation measures |
|||||||
Sensing and monitoring technologies for extreme events |
|||||||
Post-Event Assessment |
|||||||
Forensic analysis of damaged structures to understand residual capacity and develop protocols for rapid assessment |
|||||||
Inspection techniques for rapid safety assessment of damaged structures |
|||||||
Damage assessment guide for extreme events |
|||||||
Table 2: Research studies, continued.
Strategic Focus Areas |
FY03 |
FY04 |
FY05 |
FY06 |
FY07 |
FY08 |
FY09 |
|---|---|---|---|---|---|---|---|
Repair and Restoration |
|||||||
Emergency repair procedures |
|||||||
Accelerated repair and restoration techniques for reconstruction after an event |
|||||||
Evaluation and Training |
|||||||
Vulnerability Assessment Workshops (FHWA/U.S. Army COE) |
From the First three quarters of Fiscal Year 2003 to the first three quarters of Fiscal Year 2004 | ||||||
Institute a HITEC-type evaluation program for bridge and tunnel security technologies |
|||||||
FHWA Engineering Assessment Team (FHWA) |
From the First three quarters of Fiscal Year 2003 to the first half of Fiscal Year 2009 | ||||||